BuildingGreen Report

Forum topic

Hi: Great to see so many of you at AIA COTE Top Ten last week.  I'm forwarding the message below for those of you who know Marsha Maytum and can contribute to this important effort. Deadline is next Friday June 23rd!Thanks.

Mary Ann

Hello, friends,

During A'23, Je’Nen and I discussed our desire to send Marsha photos we have... Read more

Forum topic

We should probably agree on the correct spelling for what we at BuildingGreen are calling "BITuser." I noticed that on the Salesforce portfolio screenshot provided by Dennis, it's spelled "BIT User."

BITuser has the advantage of more closely resembling LEEDuser, but it has the disadvantage of looking a little weird in all-caps, as in... Read more

Forum topic

A couple Minnesota cities are considering adding electrification to their sustainable building policy (required for new construction receiving City financial assistance). Concerned that the market isn't ready for a full-on mandate, they are considering a more moderate approach of requiring developers/design teams to conduct an electrification... Read more

Author

With extensive environmental science research background, Elene Drosos provides contemporary commentary on the current climate affairs. She contributes up-to-date trends and shifts in regulations in major green building issues such as LEED and natural disasters. Her passion is to strive for biophilic design where native landscapes can dominate... Read more

Forum topic

Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Product Guide

Indoor pollutants can cause health problems and disrupt HVAC system functioning.

BuildingGreen-Approved Filtration

BuildingGreen approves a variety of equipment, filters, and pre-filters that remove particulates and contaminants, minimize pressure drop, or reduce pollution from operations. Products include:

MERV 13 or higher... Read more

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Basic page

Hurricane Tests Resilient Design—and Family Dynamics

A building project brings brothers back together, but a fast-moving storm challenges the project and the family.
Of storms & chins »

New Occupational Hazard Threatens Unshod Office Workers

Whistleblowers alert state health agencies to possible foot fungus scourge... Read more

Forum topic

Hello! 

We have several projects that are either pending ILFI Zero Carbon certification or the owner is planning to purchase offsets to cover construction emissions. Thus far, I have not considered this in our corporate footprint reporting. However, we are including A5 emissions whenever feasible and multiplying that performance over the... Read more

Forum topic

First, there was Energy Use reductions

Then there was embodied carbon

Soon it will be refrigerant use/leakage calculations

…and much more

As coordinators and leaders of project teams, what does this look like for the practicing architect and our collaborators?

I have no idea. BUT I’m guessing someone is... Read more

Forum topic

reposting Arathi Gowda -

https://communityhub.aia.org/blogs/arathi-p-gowda-aia/2024/12/17/cote-ad...

The Advocacy team (part of the AIA COTE leadership group) would like to amplify actions the USGBC has gathered to defend the IRA. As you may know, the IRA is a bipartisan bill with 63,000 infrastructure projects starting nationwide... Read more

Team Group

Quiz

Sustainability leadership has requested that you take this quiz to help assess sustainability literacy across the firm. Your own results will be presented to you at the end of the quiz but will not be shared with anyone else. Only aggregated, anonymized results will be available to others.

Please don’t do research to inform your answers... Read more

Campus-wide Group

Quiz

Welcome to the quiz portion of Affordable Housing and Sustainable Design: The Goals are Aligned

IMPORTANT: This quiz covers all related articles within this topic. Scroll to the bottom of the article page to find links to all the articles covered by this quiz.

Learning Objectives
Upon completing this course, participants... Read more

Forum topic

Hi All,

How are folks funding training for your employees? Would it help to have free training opportunities besides lunch and learns or ones you do yourself?

For those of you outside of Massachusetts you may have employees or friends in MA that this could be relevant to.  I'm hoping my friends in MA have already heard this.

... Read more

Forum topic

Hi everyone,

We're pitching a green wall to a client for a project in NYC and are looking for recommendations on systems/companies.  We've done them locally, but the company we've worked with only services the Boston area.  There are so many companies out there now that we'd rather go with one that's recommended.  Thanks in advance for... Read more

Forum topic

We have a client who is asking us to design a roughly 10 ksf Wellness Center for PHIUS 2021 certification.  The program includes several high density assembly type spaces - roughly 300 person peak occupant load for the building.  The Criteria Calculator that the architect showed us puts the building peak cooling load at 4 BTUH/sf (3000 sf/ton... Read more