BuildingGreen Report

Reports, Courses, Study Guides, Live Webinars

THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.

Hot spots: they might sound like fun places to hang out and have a drink—but in green building, they’re actually a bad thing. Something you track down so you can get rid of it. Kind of like being an environmentalist bounty hunter.

Life-cycle assessment (LCA) is... Read more

Forum topic

I've been hearing a lot of talk about density becoming a thing of the past. Like with the danger of antimicrobials, it would be great to have some more in depth backup information on whether density is really a danger factor, or if other factors are more important, when we go into these conversations. Does anybody have any new or better... Read more

Forum topic

Does anyone have experience pursing SITES certification on an essentially a zero-lot line project?

We are required to achieve silver certification, but the project scope/phasing recently changed and the entire site/parking area was eliminated and we no longer have a green roof. It still appears we can meet silver certification as so few... Read more

Forum topic

ASHRAE posted this year's list of honors and right there at the top of the list is our SMEPL colleague, Cindy Cogil - now able to add FASHRAE to her signature block!  Well done, Cindy and congratulations to ASHRAE for recognizing your accomplishments.

Forum topic

Hi SDL: Please see attached letter to USGBC about the urgent need to address climate change in the next iteration of LEED v4. It's based on the realization that in the last few years it has become clear that climate change has become the dominant global threat to humans and our fellow species. And it has also become clear that the steep... Read more

Forum topic

Hi all, we are embarking on an effort to standardize our LCA process in order to maintain a firmwide database of embodied carbon intensity from which we can create internal baselines and targets. I was wondering how other offices are setting boundaries for their LCA efforts. Below is our starting point. Most LCA will be conducted using Tally.... Read more

Portal

 

Forum topic

We have several projects that are small enough that we don't hire consultants to run energy models. I just received permission to do some training so that I can run these models myself. I am looking at doing this training on eQuest:

https://www.udemy.com/course/equest-energy-modelling-detailedtraining/?c...

I am thinking it would... Read more

Forum topic

Hi,

I have a colleague doing research on PCM in several projects. For context in their report, they were wondering if this group has seen any recent increase in application of PCMs in recent years. Is it just in ceilings or other applications? If so, what products are being used? They were having difficulty finding manufacturers other... Read more

Campus-wide Group

Forum topic

(posting here for Kira)

Sustainable Design Leaders:

Is your firm using the AIA COTE Top Ten Toolkit in some fashion? COTE would like to hear from you, especially if you are willing to share your story. 

Specifically, we'd like to share best practices and lessons about how it is working (with certain types of projects, at... Read more

Author

Dana Manafarm

Quiz

Welcome to the quiz portion of Pest Prevention: Steps Designers Can Take!

Learning Objectives
Upon completing this course, participants will be able to:


Recount the problems and challenges that various pests present to the green building industry, such as health risks to occupants and structural issues that decrease building... Read more

Forum topic

I'm hoping for some help answering the question of whether buildings/communities should pursue net-zero energy on site versus investing in new renewable energy (i.e. through the electric utility) that can be built at a more efficient scale elsewhere in the state. Our utility is asking us this question as we are working through how to get the... Read more

Quiz

Welcome to the quiz portion of Building Re-Entry with Arc

Learning Objectives
Upon completing this course, participants will be able to:


1.  Explain the similarities and differences between LEED v4.1 O+M performance metrics and the Arc Re-Entry program.

2.  Understand how Arc Re-Entry contributes to an iterative re-... Read more

Forum topic

Please use this thread for you're actions / ideas for creating more sustainable job site construction office trailers.

I know that Pepper Construction led the way with a Net Zero Construction Jobsite Trailer. (Thanks Susan Heinking!)  Is this a one off?  Any lessons learned? Any one else pursing this?  Is pepper the first and only doing... Read more

Forum topic

Does adding solar panels reduce a building's EUI?

Existing operational use of a building is 80 kBtu/sf/year. When we add solar, it will change the source of energy but does not change the usage.

My understanding is that the EUI does not change, but it would be good to hear from others.

It's energy consumption at the point... Read more

Product Guide

Typically made from petrochemicals, carpet and its adhesives can offgas. It is also a challenge to recycle them, increasing the chances that it will be incinerated or disposed of in a landfill. Because carpet has a limited lifespan, its life-cycle performance is key.

BuildingGreen recommends modular carpet that demonstrates lower life-... Read more