BuildingGreen Report

Forum topic

I'm teaching a LEED GA study group and was rambling on the differences between CIR and precident-setting LEED Interpretation (that gets posted in the addenda library and all). Then I went onto LEED Online and was showing how those are submitted... but can't actually figure out how a LEED Interpretation would be submitted. Has anyone done this... Read more

Peer Network Event

Product Guide

Caseworks can be made from unsustainable wood and other materials, and with adhesives and finishes that offgas formaldehyde and other hazardous compounds.

BuildingGreen-Approved Casework

Approved caseworks are:

made from FSC-certified wood or rapidly renewable materials verified as low emitting using CDPH Standard Method or a... Read more

Quiz

This is a test for surveys.

Team Group

Forum topic

Hello,

Are you aware of any bldg codes that have included requirements related to Material Health?

Thanks!

Mona Lemoine Architect AIBC, MRAIC, LEED AP BD+C, LFA, Regenerative Practitioner, RELi AP

Associate, Senior Sustainability Consultant

Mobile: 236-878-1752
mona.lemoine@stantec.com

Stantec... Read more

Forum topic

Please see the following invite from Professor Alexandra Rempel at the University of Oregon to participate a 15-20 minute phone/Zoom interview and share your experience and/or perceptions on the problems, challenges, and barriers to incorporating into your projects.

This effort is part of an NSF research grant that I am involved in and... Read more

Forum topic

Our specification team is currently piloting and testing new software to replace E-specs without an easy favorite, and would really love to know what other firms are using.

First question - what software does your firm use for specifications and why?

Second question - would you/your specifier be willing to chat with ours about it... Read more

Quiz

Welcome to the quiz portion of Reexamining Priorities in Green Building.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define green building priorities from a few different angles (separating process priorities from outcome priorities).
2. Differentiate those priorities... Read more

Forum topic

I'm in search of anyone who's done a LEED ACP Pilot Credit. It's unclear to me whether using one of these pathways replaces the way the base prereq or credit would function in the rating system being used by a project seeking certification or if it's a strategy to achieve Innovation in Design credits only. The documentation I've been able to... Read more

Forum topic

Hi Green Gurus: check out this new series from AIAU that delves into the design and planning application of the 4th National Climate Assessment Report by region with some more recent updates. Free to members...looks like some great speakers and highly relevant. 

https://aiau.aia.org/regional-tour-climate-risk-planning-and-design

... Read more

Forum topic

Hello,

We are in the very early planning phase of a k-8 public school project to be designed and built in an economically challenged urban location with very limited site options. The project is not LEEDv4 registered yet.  We are at feasibility and costing the soil remediation, needless to say that we would really hope there would be... Read more

Forum topic

Hi all - Reflecting on the COTE Top Ten Awards and Lloyd Alter's recent article  https://www.treehugger.com/green-architecture/keep-aiacotes-its-time-scrap-aia-awards.html, I am curious how many local/state AIA awards programs have incorporated sustainability reporting metrics as a requirement for all awards submissions, not just for categories... Read more

Forum topic

Our firm is looking into our hiring process with JEDI objectives and looking for examples that have been successful. Just like any other firms, we utilize career fair opportunities from local Universities, we have scholarship & endowment programs for several institutions, which became a major pipeline. We are working on evaluating all... Read more

Product Guide

Faucets with high flow rates waste water—not to mention the energy used to treat and deliver it to our buildings—and the additional water stresses our wastewater treatment systems.

Warnings Low-flow faucets may not be appropriate for every application. Where there are long pipe runs or large-diameter supply pipes, it can take longer for... Read more

Forum topic

The Resilient Outcomes Working Group grew from a session at the 2020 Winter Summit in Gulf Shores AL, and we are still going strong.  We are currently focused on three primary objectives: 1) bringing awareness to resilient design through a presentation at the GreenBuild 2024 Resilience Summit (we'd love to see some peer network friends at our... Read more

Forum topic

I see that the Architect 50 questions this year are organized around AIA 2030 Commitment reporting. I have a question about how people are answering them. The DDX reports have percentages that are by GSF. Are people using this percentage to answer the questions? Or are you calculating the percentage based on number of projects out of total... Read more

Peer Network Event