BuildingGreen Report

Forum topic

The Winter Summit participants have had this for a few weeks now, and no one has screamed about anything being inaccurate, misleading, or too revealing, so it's time to share the latest Summit report more widely. 

Per our long-standing policy, this report can be shared outside our "safe space"--it's a great way to share the wealth of... Read more

Forum topic

Should the Best Practice names always be accompanied by their number? See the attached screenshots, all taken from the main forum page:

Best Practice labels next to individual forum posts Best Practice names in the forum filter dropdown Best Practices in the main navigation dropdown menu

Forum topic

Hey Everyone!

We are delighted to share a major milestone in our commitment to sustainable design. After two+ years of intensive research, refining, and internal application, NBBJ is thrilled to announce the external launch of ZeroGuide, an innovative tool for early-phase carbon estimation, now available to the entire AEC community!... Read more

Basic page

Thank you for your interest in the Sustainability Leaders Peer Networks hosted by BuildingGreen. We have received your application.

A BuildingGreen team member will be in touch with you soon via email to discuss next steps in the application process.

Go to home page »

Author

As the managing editor at BuildingGreen, Elizabeth oversees the day-to-day operations of the editorial department and writes and edits content for publications. As sustainability consultant, she leads components of consulting work related to sustainable strategy, organizational change, socially responsible practices, and stakeholder engagement... Read more

Forum topic

Hi folks, I was asking around during Greenbuild and getting a variety of answers on this, and since our Contractor Commitments make a distinction between "GC's" mobile equipment as scope 1 and "Sub's" mobile equipment as scope 3. I know that many of us acting as "CM" claim full "operational control" of a jobsite and consider all fuel using on... Read more

Forum topic

Hi all -- 

We have a national restaurant client who is looking to source furniture (both indoor and outdoor) made with a minimum of 40% salvaged/recycled material, and they're very interested in finding a vendor that's woman- and/or minority-owned or that would qualify as a "disadvantaged organization" (their terminology).  They would... Read more

Quiz

Welcome to the quiz portion of Whole-Building LCA Tools for LEED v4 and v4.1.

Learning Objectives
Upon completing this course, participants will be able to:


1.  Understand the basic goals of whole-building life-cycle assessment, including how it can improve environmental performance and contribute to credit achievement in... Read more

Forum topic

Hi Friends, 

I'm working on an SOP for construction waste management for LBC core and LBC materials petal projects and wanted to get your input on the comingled facility requirements. According to the guidelines, any waste that goes to a comingled facility must be a facility that has an average diversion rate of 80% or higher as a... Read more

Forum topic

Hi All,

I meant to put this is in Green Gurus and put it in SAL instead.  Rookie mistake.

After this long winter, who is up for some fierce creativity and friendly competition internal to your company or between Green Gurus?  What do you think of a location agnostic, virtual, Sustainability Scavenger Hunt from Earth Day to Mother'... Read more

Forum topic

Hello Green Gurus!

ILFI’s annual Living Future Conference is coming up, so we thought we might host a (virtual) Show & Tell session of 5-minute versions of peer network members’ presentations like we often do in conjunction with Greenbuild. First we want to see if this is of interest to you all. Please take 30 seconds to let us know... Read more

Quiz

Welcome to the quiz portion of Waste Water, Want Water.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Help clients make sound, holistic decisions about wastewater that take into account site, municipal infrastructure, energy goals, occupant needs, and maintenance considerations.... Read more

Forum topic

Hi Sustainability Leaders,

(Note: this post was edited to correct Jen's affiliation and to add Rob Winstead.) Please join me and the BuildingGreen team in congratulating the Peer Network members of the USGBC 2023 Class of LEED Fellows!

Geoffrey Brock, IPS-Integrated Project Services, SCL

Heather DeGrella, Opsis... Read more

Forum topic

Another Break-out by Firm Size.

Guiding Questions:

SDL Best Practices by Firm Size

What's working and what's not? How are others integrating successes?

What strategies are effective in each of these areas: ongoing education, research, knowledge sharing?

How can we structure our green team across... Read more

Forum topic

If I'm remembering correctly, someone at the summer summit mentioned working on / or being familiar with the Berkeley CA gas ban. A town here in MA is also considering a ban and wanted to get some feedback from Berkeley.

Forum topic

I was talking to Nadav recently about job posting opportunities through Building Green and/or through the Peer network.  He shared this topic has been discussed in the past, and thought I should send a question out to the network.  I am guessing many of you are looking for talent right now too?  Wouldn't it be cool to know people of have been... Read more

Forum topic

I'm in search of anyone who's done a LEED ACP Pilot Credit. It's unclear to me whether using one of these pathways replaces the way the base prereq or credit would function in the rating system being used by a project seeking certification or if it's a strategy to achieve Innovation in Design credits only. The documentation I've been able to... Read more

Working Group

Forum topic

We've gotten some requests recently, so it must be time to update our salary survey. For those didn't participate in the past, we last did one in 2015, and collected some really interesting data about compensation for SDLeaders.

Our first step in getting this started is to recruit a few volunteers who are interested enough in the data we... Read more