×

Error message

  • The specified file temporary://filep1wRUK could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filecF7t4d could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileR7DC6p could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileVm9TiZ could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file0ZACtH could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Forum topic

Hi everyone, it was so great to meet some of you at the winter summit and finally connect names with faces!

We have a project that is targeting CalGreen Tier 2 and LEEDv4 Platinum.  Thought I'd reach out to see if anyone on this forum has found comparison guides between the two?  Looking for something similar to this CalGreen 2013 tier... Read more

Product Guide

Commonly used for interior partitioning of commercial buildings, light-gauge steel framing is increasingly being used in residential construction. Compared to solid wood, steel studs are lightweight, dimensionally stable, resistant to insect damage, and of consistent quality. 

BuildingGreen-Approved Structural Steel

Products... Read more

Quiz

Welcome to the quiz portion of How to Succeed with the Living Building Challenge: 12 Teams Share Tips.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Prepare for LBC imperatives.
2. Structure an LBC process around absolute goals, with proactive leadership and follow-through... Read more

Forum topic

Hi all,

My office is looking at some certification options for our upcoming renovation. One thing the management team asked me that I don't have a solid answer for is, do WELL certified spaces typically go through with recertification and everything it entails, or are they doing the upfront work to get certified and then letting it lapse... Read more

Forum topic

Hi All,

I’m pulling together a Healthy Building Summit in Boston on August 14th.  Check it out here.  http://usgbcma.org/hbs18/

Nadav is moderating!  It would be great to have some of you great leaders in attendance.  We still have sponsorship opportunities. Let me know if you are interested.

-Meredith

Forum topic

I'm putting together information on natural gas bans (or put another way, all electric buildings) for an advocacy effort and looking for some experts. Anyone have thoughts on banning natural gas and other fossil fuels on residential projects? Specifically what are the considerations/challenges/opportunities at each scale (single family, low... Read more

Forum topic

Moseley Architects is currently looking to hire a Director of Energy Analytics and Informed Design.  This is a fast paced and exciting position at an A/E firm with offices in Maryland, Virginia, North Carolina, and South Carolina.  The ideal candidate will have a passion for data, innovation, and problem-solving, along with experience providing... Read more

Forum topic

Hi all,

The AIA is collecting names of sustainability-savvy healthcare architects (and potentially allied professionals) for future national Healthcare Design Awards juries. This has been challenging, because jurors' firms can't submit for awards the year they are on the jury, and many people who otherwise would be excellent jurors work... Read more

Forum topic

Hi all, it's time to schedule our next session. Who's in? Ping me at amt@vmdo.com if you want to be considered part of the working group, and fill out your availability on this Doodle poll.

If you just want to monitor what's going on, we'll post updates to the Working Group page. 

The agenda for this call is to figure out what we... Read more

Forum topic

Keeping these meeting invites here on the SDL pages as we hope to continue to offer participation to SDL members.  The invite follows:

Welcome to the Climate Smart Wood Group monthly peer network meeting. For agenda item suggestions and other meeting organization items please contact Patrick Donnelly at pdonnelly@integrusarch.com or... Read more

Forum topic

In looking for ways to reduce jobsite waste and lower our carbon emissions, I'm working on a business plan for centralized procurement, in lieu of individual project purchasing their own tools, PPE, & consumables.  I'm curious as to how many other GC's on here use (or have used) a central purchasing process and if you have any pros/cons... Read more

Firm-wide Group

Forum topic

We're expanding the capacity of our team, with two positions, a general project sustainability specialist as well as a more targeted position focused on the healthcare sector.

Healthcare Sustainability Specialist

Sustainability Specialist

In both cases, we're looking for smart, experienced people who understand the power... Read more

Forum topic

Hi Everyone,

Who has worked on a SITES certification and can share the approximate hours involved for administering and completing documentation? A relative sense of the effort compared to LEED would also be helpful, similar to the thread about WELL on this same subject. 

Appreciate any insight. Thanks! -Hilary

Forum topic

Hi amazing people!

Most of our projects are now going with some form of gender neutral/all-gender/inclusive toilet rooms or those that can easily be converted to such. With no urinals, we lose 3 LEED points because urinals are very water-efficient. With urinals, it's not as pure a solution. Do you all just take a hit on the LEED points,... Read more

Forum topic

Hi all,

Here's a good follow up to Maria's steel question on Monday.  We have a Midwest project that unfortunately (from a carbon perspective) is required to use a traditional, thick precast facade.  We’re working with the contractor and potential future (not yet bid out) fabricators to determine an appropriate % of pozzolanic material... Read more

Campus-wide Group