BuildingGreen Report

Forum topic

Hello Folks,
What is your experience with successes and failures in the design process? As a starting point I have listed my Top 5 for success, and my Top 5 for failure. We'd love to see your reactions and look forward to the discussion when we all meet next week at our monthly check-in.

Top 5 reasons for when integrative design... Read more

Forum topic

Hi,

HKS is seeking two seasoned sustainability leaders to be part of the DesignGreen Team embedded into either our Mission Critical and Commercial Mixed Use practice. In general, the role is to service clients and drive sustainable design quality forward. We have a great team and need even more wise, energetic, creative, and committed... Read more

Product Guide

Plastic windows come in both ABS and vinyl (PVC). Even though PVC is particularly loathed by environmentalists, energy performance is BuildingGreen's primary green consideration for windows, and some vinyl windows offer exceptionally strong energy performance, often with competitive pricing.

BuildingGreen-Approved Plastic Windows

... Read more

Forum topic

Hello Sustainable Construction Leaders,

Save the date! The network's next quarterly call is scheduled for 1pm ET (10am PT), Tuesday November 16th. Topic TBD. Steering Group member Emi LaFountain from Turner will be leading the conversation.

Keep an eye on this thread for more details and Zoom information.

Jen

Forum topic

Team,

Many of you saw this from BlackRock.

https://www.blackrock.com/corporate/investor-relations/larry-fink-ceo-letter

SOM, starting with London office, is drafting a letter to our MEP consultants, demanding and holding them accountable for climate change as a preference on consultants selection.

Best,
LL 

Forum topic

Hi Everyone.  Hope you and your families are all healthy and safe.

We are starting to figure out how we are going to implement the Contractors Commitment at my company, and we're using the opportunity to simultaneously set corporate wide and jobsite metrics and goals for sustainability tracking.

Each year we issue a sustainability... Read more

Quiz

This summit was pre-approved for  6 GBCI CE hours.

Please complete the survey question to confirm your attendance and receive your CEUs.

By providing your credential numbers in your profile, you will enable us to automatically report these CEUs to the organization. Please first check your profile to be sure your information is... Read more

Forum topic

I was wondering if any of you have experience with integrated PVs and/or solar glass. If so, can you could recommend manufactures for each? We are working on a multistory freestanding building in an urban site for a mid-Atlantic city. Because our site and roof area are limited we are looking to maximized the areas where we can generate power.... Read more

Basic page

The Post-Yost Experience

What better way to follow up the magic of a live presentation from Peter Yost than with 30 free days of BuildingGreen Premium?

Get a free 30 days of BuildingGreen Premium »
No credit card required Peter Yost, relaxing after a long week's work.

Quiz

Welcome to the quiz portion of How to Make Integrated Project Delivery Work for Your Project.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. State three problems that Integrated Project Delivery (IPD) promises to solve.
2. Dispel four misconceptions about IPD that have... Read more

Campus-wide Group

Forum topic

If only a few of the Best Practices will have checklists, which will be included under the "Implementation Toolkit" tab, I'm thinking we can simplify them (compared with LEEDuser).

I've attached a screenshot of a LEEDuser checklist. But I don't think BITuser will need the four types of icons, and the legend will take up more space than... Read more

Forum topic

Hi all,

We have a newly constructed, core/shell project having some hot water issues in the core restrooms.

There is a 0.35 Toto lav installed throughout. The hot water heaters are adjacent on each floor, located in the janitor closets. We did the math, and there could be a gallon of water standing and cooling in the pipe between... Read more

Forum topic

We had these conversations grouped by size of firm. 

Guiding Questions:

Knowledge Management By Firm Size

How to give people the info they need, when they need it?

Is the COTE Top Ten a good framework?

This seems extremely daunting in a large firm. How do we manage content that is produced and shared... Read more

Forum topic

Hello - 

I am looking for the recording and the PDF/ slides that were shared 3/6 for the project process share-out/ 5 min presentations. It was super inspiring and I would like to refresh my memory of some of what was shared. Thank you!


Alison Nash 
AIA, LEED AP ID+C, CPHC, WELL AP
Associate | Sustainability... Read more

Forum topic

We have an MEP engineer that is calculating peak loads at about 6 times passive house levels on a large commercial building that is at or near passive house levels of insulation and air infiltration. We suspect one reason is that he is figuring a 50% efficiency level for the ERV. We are showing him ERV systems with 80-90% efficiency, but they... Read more

Forum topic

It is with the greatest pleasure that I announce to this esteemed group the recognition of our very own and much-loved leader Nadav Malin as an Honorary AIA member. AIA COTE had the honor to serve as Nadav's sponsor and we are pleased and delighted with this outcome (but not surprised of course.) For the record, "The AIA recognizes the notable... Read more

Firm-wide Group