×

Error message

  • The specified file temporary://fileTyPnTg could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filefFTcND could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileLa208r could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileA3mTlb could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file8nPLMs could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Forum topic

testing

Quiz

Welcome to the quiz portion of What You Need to Know About Concrete and Green Building.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Recognize concrete's environmental footprint and how to reduce the quantity of concrete used in buildings.
2. List the advantages and... Read more

Forum topic

I just saw this post from Conor on LinkedIn.

Starting in January 2019, all new Columbia Construction Company projects require LED temp lighting.

Are others doing this too? Frankly, given all the benefits and how quickly the industry is matured, it's hard for me to understand why anyone would use anything other than LEDs on a job.... Read more

Forum topic

I'm looking to draft some one-page briefs for my consulting engineers to outline what we would like to see in their specs regarding certain materials and systems. For example, letting the plumbing and civil engineers know that we prefer to eliminate PVC pipe and want them to specify alternatives like Polypropylene, cast iron, ABS, etc. The idea... Read more

Campus-wide Group

Forum topic

BITuser Meeting:  5/23/18

Participants:  Shane, Andrea, Angela

Notes:

Southface to provide "style tiles" before 6/15 
Greg to send to Andrea, couple dozen images for Best Practice pages
Southface will send, in week to 10 days, "full content" for BP03 - Energy Audit 
(BP03 "full content" will address... Read more

Forum topic

Hey there hive mind,

Anyone have any CxAs in the Bay Area that they'd particularly recommend? I have a project in need.

Aley

Forum topic

Hi Fellow GG: I just wanted to make sure everyone saw the great announcement from the White House yesterday about Code updates to address energy efficiency and resilience. It's great to see these kinds of initiatives that hopefully can continue for a few more years. So let's try to take advantage of them (said by someone who lives in Missouri... Read more

Forum topic

Hi all,

We are about to start a affordable housing passive house project in Boston and in a few presentations I've seen great signs that builders use to try to get the point across to subs as to how important air sealing is. Some are even quite funny! The builder we are working with does not have a sign like this, but is open to ideas.... Read more

Forum topic

I opened IE11 (Internet Explorer 11) today, and saw a message indicating IE11 will be retired June 15th, 2022. While I have no personal attachment to IE11, it was the only internet browser I could consistantly get to open LEED Online credit templates on the actual website. 

Has anyone found another way to be able to fill out LEED credit... Read more

Quiz

Welcome to the quiz portion of Wood: What’s Good?

Learning Objectives
Upon completing this course, participants will be able to:


Define “biogenic carbon” and explain its implications for life-cycle assessment of wood products. List the benefits and limitations of seven types of structural wood products.  Understand how... Read more

Campus-wide Group

Forum topic

Hello, what acceptable levels of air quality are you using to evaluate natural ventilation strategies for your projects?  In our Living Building we only open windows when PM10, PM2.5, etc. are within LBC and WELL limits.  In a seasonally smoggy urban environment, this limits how often we can utilize natural ventilation even if the outside... Read more

Forum topic

Ali Flynn and Alejandra Arce Gomez are planning a breakout meeting for the Waste Managment Group for all interested. 

Please fill out the doodle poll below so that we can find a good time:

https://doodle.com/poll/qxd4zxrw9xzrxwc6

Ali and Alejandra have drafted an updated version of the Commitment for Waste (attached) after... Read more

Forum topic

Has anyone here found an alternative to XPS for the void former?

A structural engineering contact was included in recent conversations about embodied carbon in insulation materials and brought to our attention that this is a common use for XPS that has nothing to do with its insulating properties. It is typically used where concrete is... Read more

Product Guide

CEUs are available for reading all the building-envelope product guides and primer. Click here to learn more and take the quiz.

Stick-framed walls are labor intensive and have to be sealed and insulated in the field, where conditions are not ideal; this can lead to poor thermal performance.

BuildingGreen-Approved Structural... Read more

Forum topic

Hi SCL, 

Just thought I would share an interesting piece from Construction Dive about a lack of guidance on when to halt work due to bad air quality--from wildfires or otherwise. A few SCL companies are mentioned here as having their own policies, but I was pretty shocked to learn that this isn't required by OSHA. 

https://www.... Read more