Forum topic
Green Gurus,
We'd love your feedback.
The MEP group is endeavoring to make progress on integrative design. It has been long accepted that integrative design is necessary to make real progress, but a lack of stellar results demonstrates that it is easier said than done.
What is your experience with successes and failures... Read more
Forum topic
Hello SDL Leaders,
Over the past month, I have been working with ILFI to navigate the question of residuals in LBC compliant products vs. products reporting for a Declare label.
Through our conversations, it came to light that ILFI considers the LBC Red List threshold to be 10,000 ppm, rather than the 100 ppm written into the... Read more
Forum topic
Hi all, it's time to schedule our next session. Who's in? Ping me at amt@vmdo.com if you want to be considered part of the working group, and fill out your availability on this Doodle poll.
If you just want to monitor what's going on, we'll post updates to the Working Group page.
The agenda for this call is to figure out what we... Read more
Basic page
Product Guide
CEUs are available for reading all the building-envelope product guides and primer. Click here to learn more and take the quiz.
Vapor retarders are meant to protect our building assemblies from getting wet, but they can also slow drying, contributing to mold and structural degradation.
BuildingGreen-Approved Vapor Retarders
... Read moreProduct Guide
CEUs are available for reading our entire plumbing guide. Click here to learn more and take the quiz.
Graywater can be treated and used for irrigation or toilet flushing, reducing significant burdens on municipal drinking water and wastewater treatment systems.
BuildingGreen-Approved Graywater Products
BuildingGreen... Read more
Forum topic
Hi everyone,
I'm interested in identifying any in-person opportunities (local to Greater Boston) to engage my office during Earth Week. We are all excited to be able to do things in person now, so if anyone has anything on their radar please let me know (a panel, educational activity, or volunteer opportunity!)
Thanks,... Read more
Forum topic
Can you comment on successful ways you have used eQUEST and pitfalls you have seen? We are considering training our architects to use it for early building analysis on all projects.
Forum topic
Hey there hive mind,
We went looking through LEEDuser to try and find some direction and didn't find much so I thought I'd bring my team's question here to all of you smart people. We're working on a non-combustion central plant tied to a geothermal field and grid electricity. The project has cooling towers and their associated chemical... Read more
Forum topic
Has anyone used Insight for Revit to document the LEED Daylight Credit If so, would you recommend it?
Thanks,
_Ilana
Forum topic
Attached are the raw notes from the Design Process Conversations.
And here are the Guiding Questions from the Agenda Survey:
Design Process: how to intervene to get better outcomes?
How do I crack the nut of making a difference within my firm in the Design Process?
What strategies alter our fast-paced design... Read more
Forum topic
My name is Boyd and I’m the newest member of the BuildingGreen Peer Networks team. I’m joining BG after a long line of jobs in the service industry. I’ve worked everywhere from breweries to adventure sports companies and I’ve loved every job along the way. I was drawn to BG because of my history of meeting people and fostering connections and... Read more
Forum topic
I have been watching LEED Zero for a while, and have appreciated certain things, but one thing I think is an absolute disaster is their allowance of mainline RECs for claiming Zero Energy and Zero Carbon performance. I just asked this question on the LEED Zero webinar, and the panelist basically said, "it's part of LEED Zero, therefore it is... Read more
Forum topic
Hi (again) all,
Jacobs is looking to hire specifically for sustainability needs! We have a current job posting for a Senior Sustainability Specialist now up, and anticipate a similar posting soon for a mid-level person as well. Location for these would be in the Mountain or Pacific time zones, remote work is fine; other future... Read more
Forum topic
Hi All- I will be starting bi-weekly mtg for the PFAS working group to align on our goals as consicous firms and finalize our message aka 'letter to manufacturers' for reducing PFAS in building materials. Please email me (pgupta-garg@wrnsstudio.com) to let me know if you are interested in being a part of the group. First mtg will be next week... Read more
Forum topic
Hello everyone,
Here's a reminder that our next monthly call will be taking place next Tuesday, September 10th at 2:00pm EST.
Please feel free to join us!
Join Zoom Meeting
https://zoom.us/j/661110941
Dial by your location
+1 929 205 6099 US (New York)
+1 669 900 6833 US (San Jose)... Read more