×

Error message

  • The specified file temporary://fileXf24Dt could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filea7VvrE could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filew3kjYd could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileNAMYeT could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filevQbp3Y could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Author

Forum topic

I know that there is a risk of starting a whole flurry of congrats through the forum, but this is a biggie, and deserves some recognition:

Congratulations Andrea and Melanie!! Huzzah!!

And a reminder--If you want to reach out to them privately, rather than through the forum, with your message, you can see anyone's email address by... Read more

Forum topic

Dear Colleagues,

The EPA has released a very impressive proposal for ENERGY STAR specs for residential water heaters that will strongly encourage electrification and decarbonization of these appliances. 

ENERGY STAR is a voluntary program for high performance appliances and this is a huge opportunity to begin the decarb transition... Read more

Forum topic

Dear SLD-ers,

We have a project team considering the use of copper cladding for a high profile project in Vancouver. The preference is to use pure copper that is pre-patinated and does not have additional coatings.

We are attending a CEU from the Copper Development Association to understand options and environmental impact, but we... Read more

Campus-wide Group

Product Guide

Rotary Uninterruptible Power Units

Power interruptions and brief changes in voltage can damage electrical equipment, compromise computer data, shut down manufacturing, and endanger hospital patients. In the case of power outages, generators usually take over, but about 98% of all interruptions last less than ten seconds, and there is a... Read more