BuildingGreen Report

Forum topic

The position for my replacement has been posted. Please share within your networks. Thanks!

http://www.fxcollaborative.com/profile/9/careers/

Peer Network Event

Forum topic

Hey Peer Network! Curious, if we can crowd-source a solution here for the pervious pavers at our Omaha office (climate zone 5A). Apparently over the years we've tried to add different kinds of fill here (gravel) but it keeps... disappearing. Any recommendations with either a replacement product or fill item? 

Forum topic

Has anyone completed an LCA for an engineering structures lab, particularly one that has a strong wall and strong floor? 

Forum topic

Hi there SD Leaders,

We're running an LCA on one of our projects that's about to start construction that has had serious embodied carbon goals and I got a result that really surprised me. I haven't been able to find any obvious/glaring issues with the work, but these results are strange enough that I'm not feeling confident. I'm hoping... Read more

Team Group

Forum topic

Hi Carbon Working Group,

It’s been a while since our last online meeting on 3/31 –- admittedly, a bit too long -- so I wanted to share some updates.  You might have seen Candice Pearson’s 5/13 post about the structure of the Contractor’s Commitment and how it’s evolving into a set of guidelines available not only to our SCL Group but to... Read more

Firm-wide Group

Author

As Editorial Director for BuildingGreen, Tristan Roberts brings a deep commitment to environmental stewardship, a broad knowledge about sustainable design, deep understanding of green building products, and a mastery of all things LEED. A longtime contributor of in-depth feature articles in Environmental Building News and regular reporting on... Read more

Forum topic

Dear All!

Crowdsourcing here to see if anyone has access to two LCA's that can be used to compare functionally equivalent consumer products: a fossil fuel powered to a battery one?  (A good product might be a car or stove, or a heating system with a boiler compared to a heat pump, perhaps?  Needs to include the B-use phase probably...)... Read more

Forum topic

As part of the Philadelphia AIA COTE, we have been proposing implementing sustainability in some fashion into the design awards with our chapter's design committee.  I know that many of you have been down this road before, and wanted to get your feedback at a high level about what your local COTE is doing.  Anyone who's interested, can you... Read more

Forum topic

Hi everyone - we have a new higher ed client who is committed to sustainability but not very knowledgeable about current topics such as carbon (both embodied and operational) or the electrification of buildings.  I need to educate them and would like to start with some easily-digestible background reading.  But as we all know, we're a bit dorky... Read more

Forum topic

Has anyone had experience working with Hyper Metro (http://hypermetro.co/)? If so, did you find this company to provide value especially in dense urban environments where on-site segregation poses challenges to manage multiple C&D material streams on site? Hyper Metro claims to be able to provide rebates and to pay us for our trash.

Forum topic

Hi folks,

I hope you've seen the plug to sign onto the letter that's generated a flurry of messages on Green Gurus--I also emailed it out directly to everyone. We've got lots of architects on board, and a handful of engineers, but I think we just have one contractor so far (Thanks Theresa!)--it would be really awesome to have more.

... Read more

Forum topic

Hi everyone! I'm extremely pleased to be back in this group after a couple of years out and I'll spare no time in spamming your inboxes. 

MASS is working with UT Austin to help them evaluate their campus buildings for reuse firstly and then deconstruction and material reuse. Their campus, as with most campuses, is constantly being built... Read more

Quiz

Welcome to the quiz portion of How to Make Integrated Project Delivery Work for Your Project.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. State three problems that Integrated Project Delivery (IPD) promises to solve.
2. Dispel four misconceptions about IPD that have... Read more

Author

Basic page

The Post-Yost Experience

What better way to follow up the magic of a live presentation from Peter Yost than with 30 free days of BuildingGreen Premium?

Get a free 30 days of BuildingGreen Premium »
No credit card required Peter Yost, relaxing after a long week's work.