×

Error message

  • The specified file temporary://filefI6igi could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileRCrbmM could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileZ61V2g could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileqZ0q4t could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileH1pdg7 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Campus-wide Group

Forum topic

Hello Folks,
What is your experience with successes and failures in the design process? As a starting point I have listed my Top 5 for success, and my Top 5 for failure. We'd love to see your reactions and look forward to the discussion when we all meet next week at our monthly check-in.

Top 5 reasons for when integrative design... Read more

Quiz

Welcome to the quiz portion of Finding Products for LEED v4 and v4.1!

Learning Objectives
Upon completing this course, participants will be able to:


Explain the connection between building products and the whole-building life-cycle assessment credit option in LEED BD+C v4 and v4.1, and understand how this connection can... Read more

Campus-wide Group

Forum topic

Team,

Many of you saw this from BlackRock.

https://www.blackrock.com/corporate/investor-relations/larry-fink-ceo-letter

SOM, starting with London office, is drafting a letter to our MEP consultants, demanding and holding them accountable for climate change as a preference on consultants selection.

Best,
LL 

Forum topic

Hi, all. We missed you at the standing check in today. We have a couple of questions for the BG team:

1. What is the timing criteria you need for Best Practice content? We need to back into a deadline on submissions and believe your critical path timing will help define ours.

2. Can you elaborate on what LEED User/BG content may... Read more

Quiz

Welcome to the quiz portion of New Concepts in LEED v4.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Recognize the ways in which the Integrative Process credit requires teams to analyze opportunities early in design.
2. Describe how the new Location and Transportation... Read more

Forum topic

Friends of EPIC –

Hey, everyone. As some of you might have heard, we’ve been working for a while with Autodesk to get c.scale (the data model behind EPIC) built into Forma – Autodesk’s AI-powered planning tool. Forma is packaged within Autodesk’s AEC collection and most firms using Revit should already have access. This integration is... Read more

Product Guide

Depending on seating type­­, these products can contain PVC, toxic flame retardants, hazardous adhesives and finishes, and other unsustainable materials.

BuildingGreen-Approved Seating

BuildingGreen’s seating meets ONE of the following sets of criteria:

is certified to BIFMA’s level 3 standard and, where applicable, contains... Read more

Forum topic

Hi SDLers! I hope early fall is finding you well.

There is a current opportunity to make a difference in the campaign to reduce use of toxic flame retardants.

Arlene Blum and the Green Science Policy Institute, whom many of you know, are currently organizing a campaign of support for the CA State Fire Marshal's proposal to allow... Read more

Forum topic

Hello all!

I'm new to the group, and so excited to be here. Two part question here (as we think about processes and new year goals).

I am at a smallish firm (20 people) in Boston helping to reform our processes to enable even those that are not steeped in sustainability at a daily level to be comfortable looking for opporutunities... Read more

Forum topic

We have an MEP engineer that is calculating peak loads at about 6 times passive house levels on a large commercial building that is at or near passive house levels of insulation and air infiltration. We suspect one reason is that he is figuring a 50% efficiency level for the ERV. We are showing him ERV systems with 80-90% efficiency, but they... Read more

Forum topic

Hi Everyone, 

Has anyone had success in finding organizations or programs that will recycle the hard hats? We are looking into options for recycling our expired hard hats that can no longer be used. Ideally, we would want to use a company with facilities across the country but we are open to any suggestions or ideas you all may have.... Read more

Forum topic

Hello Everyone,

On September 9th a regional cross-network group gathered for the first in-person Peer Networks event since the beginning of the pandemic. All Peer Networks were represented at this Boston Region Mini-Summit! With this first one in the books, BuildingGreen is hopeful for paving the way to future regional events across the... Read more

Forum topic

Dear SDL: Thanks to all who have already given their support to the AIA Resolution on Urgent and Sustained Climate Action. We're into the final push of getting out the vote to pass the resolution next Wednesday, June 5th afternoon in Las Vegas. This requires 2/3s of the voting delegates to pass. So we're asking anyone who 1) is attending as a... Read more

Forum topic

Hi everyone,

Have your projects explored, pursued, or successfully achieved the domestic content bonus for PV systems within the Inflation Reduction Act (IRA) Investment Tax Credit? I have a project that is considering adding the IRA domestic content requirements and we are trying to understand the nuances and potential challenges (cost... Read more

Forum topic

Hi Everyone - I hope this isn't a repeat topic. We are starting to get familiar with TallyCAT at SAR+ and have a few people testing our projects in it. Is anyone willing to help us troubleshoot or share lessons learned? We're running into a few errors and wonder if our Revit models and workflow are the issue, or if we need to be doing something... Read more