BuildingGreen Report

Forum topic

We have a client for whom we are designing a very high performance manufacturing facility, and they want to communicate their building's performance both dynamically and in real-time within their lobby for guests and staff.

We would like to mine the wisdom of this group to see what recommendations we can muster regarding high quality... Read more

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Quiz

Welcome to the quiz portion of Circular Economy at Scale: Six International Case Studies.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define circular economy and explain its importance within the built environment.
2. Describe how to leverage long-term value over first... Read more

Forum topic

Following up on conversation from the Fika today, Kim said the IRS is supposed to be issuing rules for tax-based (even for orgs that don't pay tax) credits by the end of first quarter.  Sounds like we all just need to be on the look out still.

Forum topic

We're thrilled to announce that, for the first time, the 2025 Summits for each Peer Network will be hosted within one week and in a single location. You’ll get the deep peer-to-peer time you love from a Summit AND some glorious cross-disciplinary time to experience the power of the Green Commons. It’s all happening at the Kimpton Cottonwood, a... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Reports, Courses, Study Guides, Live Webinars

Successfully managing the LEED documentation process requires specific knowledge, tools, and skills that are not covered in the LEED Reference Manual. This CEU course is based on the LEED Project Management course that GreenStep developed and teaches through UC–Berkeley Extension. It is designed for professionals who are somewhat familiar with... Read more

Forum topic

Greetings Gurus!
Please sign up and spread the word (even if you can't attend, sign up to get follow up info!)

This is one of a series of Hackathons to crowdsource alternative design details that are intentionally meant for disassembly! The outputs are meant for public consumption so that anyone who doesn't have time (that's... Read more

Forum topic

Hi everyone,

I am writing to let you know about a change we are making here at BuildingGreen. We will be changing the name of this all-Peer Networks forum “Green Gurus” to “Green Commons.” 

We’ve made this decision after learning that using the term “guru” outside of its cultural context is appropriative. In an effort to center... Read more

Product Guide

Ground- and water-source heat pumps move refrigerant or water through the ground or a body of water for use as a heat source (for indoor heating) or heat sink (for indoor cooling).

BuildingGreen-Approved Heat Pumps

BuildingGreen approves:

super-efficient commercial systems residential ground- and water-source heat pumps that... Read more

Forum topic

Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more

Peer Network Event

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Forum topic

I'm writing an article surveying and comparing various embodied carbon tools, including whole-building LCA tools. I'm looking for interviewees who have used at least TWO of the three major LCA tools currently in use in North America (Tally, Athena IE, and One Click LCA). If you've tried all three, all the better! If you or someone in your firm... Read more

Forum topic

Hello Green Gurus,

I'm excited to share another Peer Networks webinar we have on deck for August, coming up next week!

Register HERE.

“How Good is this Product?” - Multi-Attribute Assessment of Products and Product Selection Management Tools
Thursday, August 19th, 2021
12pm - 1pm ET (9am - 10am PT)

... Read more

Forum topic

First, there was Energy Use reductions

Then there was embodied carbon

Soon it will be refrigerant use/leakage calculations

…and much more

As coordinators and leaders of project teams, what does this look like for the practicing architect and our collaborators?

I have no idea. BUT I’m guessing someone is... Read more