Product Guide
Rotary Uninterruptible Power Units
Power interruptions and brief changes in voltage can damage electrical equipment, compromise computer data, shut down manufacturing, and endanger hospital patients. In the case of power outages, generators usually take over, but about 98% of all interruptions last less than ten seconds, and there is a... Read more
Forum topic
Friends,
As some of you know, I joined Perkins Eastman last year and it has been amazing. After years of being the Sustainable Design Leader at my last firm, this move has meant I can concentrate on project work because we have such an AMAZING team, led by Heather Jaurequi and Tanya Eagle. Unfortunately, that also means I'm not in the... Read more
Forum topic
Hi Carbon Working Group,
It’s been a while since our last online meeting on 3/31 –- admittedly, a bit too long -- so I wanted to share some updates. You might have seen Candice Pearson’s 5/13 post about the structure of the Contractor’s Commitment and how it’s evolving into a set of guidelines available not only to our SCL Group but to... Read more
Forum topic
Has anyone completed an LCA for an engineering structures lab, particularly one that has a strong wall and strong floor?
Forum topic
Greetings to all of the AEC SD Leaders (a.k.a. the Green Gurus)!
Over the last two months, the 32-member Build-Back-Better (BBB) letter working group has developed a robust list of first 100-days, built-environment-focused executive actions for the Biden administration to consider. Kara Kempski, the AIA’s Director of Federal Relations,... Read more
Forum topic
Hi everyone! I'm extremely pleased to be back in this group after a couple of years out and I'll spare no time in spamming your inboxes.
MASS is working with UT Austin to help them evaluate their campus buildings for reuse firstly and then deconstruction and material reuse. Their campus, as with most campuses, is constantly being built... Read more
Quiz
Welcome to the quiz portion of LEED v4 Tips from Early Adopters: Earn High Ratings Without Added Costs.
Learning Objectives
Upon completing this course, participants will be able to:
1. Explain how the Integrative Process credit rewards good design but is tricky for taxpayer-funded projects.
2. Describe how... Read more
Reports, Courses, Study Guides, Live Webinars
Now available on demand
As more and more architects, designers, contractors and owners demand transparency surrounding human health impacts in the built environment, manufacturers need short cuts and tools to meet the call of this demand.
This webinar is intended to educate manufacturers about the market demands for creating... Read more
Forum topic
Asking for a colleague:
"Have you ever had a large number of fire retardant tarps used to temporarily enclose a building during construction? Do you know of any solutions for recycling/reusing them or another product that doesn't use toxic fire-retardants that meets the performance criteria?"
I think we've all seen poly or fabric... Read more
Forum topic
Show & Tell Breakout: share what’s working and what isn’t! Which tools are your favorites? Have you developed any innovative applications? Discovered new pitfalls?
Presentations:
Experiences with Sefaira Early Performance Modeling software. How I got the firm to subscribe, how it wasn't working, and how I have been working with... Read moreForum topic
Hi All,
The rural concrete supplier that is used for most of our projects sources their fly ash from a nearby coal burning plant that is scheduled to be closed in the next two years. In anticipation of this, they are looking into alternative fly ash sources and SCM options and we'd like to provide suggestions.
Does anyone have... Read more
Forum topic
Some of you are aware of my ongoing saga of off-site renewable energy and a LEED certification we are pursuing. The short version is that there is a new-construction corporate headquarters office building (Building #2 on the attached graphic). This building is pursuing LEED certification.
The company also just installed a 1 MW... Read more
Forum topic
Hi Green Gurus,
I am happy to join this group, and would like to share a short introduction of myself. I’m Jais, and I am with FXCollaborative as a Sustainability Design Specialist working with Ilana Judah. I have been here little over a month and am enjoying it so much!
I have studied architectural design focused on... Read more
Product Guide
Depending on seating type, these products can contain PVC, toxic flame retardants, hazardous adhesives and finishes, and other unsustainable materials.
BuildingGreen-Approved Seating
BuildingGreen’s seating meets ONE of the following sets of criteria:
is certified to BIFMA’s level 3 standard and, where applicable, contains... Read moreForum topic
Has anyone had experience working with Hyper Metro (http://hypermetro.co/)? If so, did you find this company to provide value especially in dense urban environments where on-site segregation poses challenges to manage multiple C&D material streams on site? Hyper Metro claims to be able to provide rebates and to pay us for our trash.
Forum topic
from the Tortured by Randomness Department:
Y'all ... I was recently reminded (by Bill Reed) about a lovely quote ... and I'm keen to use it in a talk upcoming ...
Here it is:
Place is a doorway into caring. Love of place unleashes the personal and political will needed to make profound change. It can also unite people... Read more