Product Guide
Glazing connects occupants to the outdoors, but with so many opportunities for air leakage, poor insulation, and thermal bridging, glazing is the primary weak link in building energy performance.
BuildingGreen-Approved Glazing SystemsBuildingGreen approves glazing that offers strong energy performance properties for a variety of... Read more
Forum topic
Hi Everyone - I'm posting this on behalf of Jeff Frost whom many of you know from his days as an SD Leader with SmithGroup and SERA and in his new role as head of Brightworks Sustainability's materials group. I am excited to be working with Jeff on this concept of multi-attribute product scoring. Cheers, Lona
Dear SDL’ers,
We’ve... Read more
Forum topic
Has anyone completed an LCA for an engineering structures lab, particularly one that has a strong wall and strong floor?
Forum topic
Hey all,
We have a NAVFAC project going into construction that has indicated that they'd like to hire someone to help them with the construction tracking aspects of the UFC requirements, including the Guiding Principles Assessment (GPA) program through GBCI. We're on the design side, so cannot offer these services on our own project;... Read more
Forum topic
Dear Colleagues:
If you are short on time, here is the executive summary:
Time to make healthy trouble and sign a petition today to the WHO to urge them to recommend the implementation of best practice healthy air guidelines in light of the recent studies showing a direct link between the spread of COVID-19 through aerosol... Read more
Forum topic
Dear All!
Crowdsourcing here to see if anyone has access to two LCA's that can be used to compare functionally equivalent consumer products: a fossil fuel powered to a battery one? (A good product might be a car or stove, or a heating system with a boiler compared to a heat pump, perhaps? Needs to include the B-use phase probably...)... Read more
Quiz
The construction sector’s take-make-waste approach to materials needs an overhaul. Materials and construction account for an estimated 11% of global greenhouse gas emissions annually. At the other end of the life cycle, demolition in the United States annually generates 90% of some 600 million tons of construction-sector debris. Getting trashed... Read more
Forum topic
In case you need a good inspirational cry today: https://youtu.be/tzL79SUBzgg
Really and truly, it's stuff like this that lets me know we're going to be okay.
Aley
Forum topic
Hello everyone!
A small subgroup SCL members have been working on writing a response the presentation Wes Sullens gave us at the Summit this past winter. It's been a long process but the letter and all it's reccomendations are drafted and ready to present. The group felt it prudent to post the response here first for a short public... Read more
Forum topic
Hi everyone - we have a new higher ed client who is committed to sustainability but not very knowledgeable about current topics such as carbon (both embodied and operational) or the electrification of buildings. I need to educate them and would like to start with some easily-digestible background reading. But as we all know, we're a bit dorky... Read more
Forum topic
Hi folks!
Do you have examples or case studies of projects with compelling examples of circularity/salvaged material reuse? We’re looking to go beyond the examples we've seen of furniture reuse or creating art from salvaged material, and we’d like to collect some examples to get our client excited about the possibilities in a deep... Read more
Basic page
BuildingGreen Approved, like its predecessor, GreenSpec, is an independent product evaluation service for BuildingGreen members. We offer an unbiased look at products: BuildingGreen does not accept any manufacturer fees for our evaluations. Here’s a quick tour of the platform and how to use it.
Who can access BuildingGreen Approved... Read moreQuiz
Welcome to the quiz portion of Whole-Building Life Cycle Analysis: Promises and Pitfalls.
Learning Objectives
Upon completing this course, participants will be able to:
1. Define whole-building life-cycle assessment.
2. Explain what whole-building life-cycle assessment can and can't do so you can work within... Read more
Forum topic
Show & Tell Breakout: share what’s working and what isn’t! Which tools are your favorites? Have you developed any innovative applications? Discovered new pitfalls?
Presentations:
Experiences with Sefaira Early Performance Modeling software. How I got the firm to subscribe, how it wasn't working, and how I have been working with... Read moreForum topic
We've updated the Salesforce BIT Community domain from "https://southfacecommunities.force.com/BITBuilding/s/" to "https://www.bitbuilding.org/s/" and there are a few links on BITuser that point back to the community that need updating.
BIT Building Community Dashboard - point to "https://www.bitbuilding.org/s/" Contact Us - point to "... Read moreForum topic
Has anyone had experience working with Hyper Metro (http://hypermetro.co/)? If so, did you find this company to provide value especially in dense urban environments where on-site segregation poses challenges to manage multiple C&D material streams on site? Hyper Metro claims to be able to provide rebates and to pay us for our trash.