BuildingGreen Report

Forum topic

All,

I've probably spoken to a few of you over the phone, but I wanted to make sure all of you know that we are hosting a 4 part webinar series on our Tally LCA software, kicking off tomorrow 10/10. We just released the new of Tally version and ended up doing far more development work than initially anticipated, in no small part due to... Read more

Quiz

It may take hundreds or thousands of years to return to pre-industrial-age levels of atmospheric carbon dioxide, but the loss of animal and plant species that is occurring today is, practically speaking, irreversible. It will take millions of years for evolution to fill the ecological niches being vacated by extinctions and restore healthy... Read more

Forum topic

Hi there SD Leaders,

We're running an LCA on one of our projects that's about to start construction that has had serious embodied carbon goals and I got a result that really surprised me. I haven't been able to find any obvious/glaring issues with the work, but these results are strange enough that I'm not feeling confident. I'm hoping... Read more

Forum topic

Here are the links I mentioned at today's meeting:

Timeline:
https://docs.google.com/presentation/d/1RlN4t23uvBtxEzp4QuyqL-w5bqmE4P90...

BG Contacts and Responsibilities:
https://docs.google.com/document/d/1MWYuAEitjk7Zpc8KUNf1LwG3-5wK6sIlgwro...

BITuser Contacts and Responsibilities:
https://docs.google.... Read more

Forum topic

I received this email from Cathy Higgins at NBI, and thought some of you may know the right folks who might be interested:
---------------------
Hi colleagues,

You are exactly the folks that might know a high-caliber person to join NBI’s team. We are looking for someone ideally based in California but could be elsewhere with... Read more

Author

Pumpy Nullifidian

Forum topic

Hi Carbon Working Group,

It’s been a while since our last online meeting on 3/31 –- admittedly, a bit too long -- so I wanted to share some updates.  You might have seen Candice Pearson’s 5/13 post about the structure of the Contractor’s Commitment and how it’s evolving into a set of guidelines available not only to our SCL Group but to... Read more

Forum topic

I'm sure most (if not everyone) is aware that LEEDv5 is under public review until May 20, 2024. I know I need to make time to flip through it, review, and comment, but I'm having a heckuva time protecting the time in my calendar to do that. Anyone interested in joining me for a 60 - 90 minute meeting to do this together as an accountability... Read more

Forum topic

Hi everyone, on our SDL Regional Leaders call today we touched on how different offices are engaging with the Youth Climate Strike on Sept 20, and I offered to share a few resources that we've developed:  

1) Here is our public-facing official statement/endorsement: https://www.vmdo.com/architecture-blog/vmdo-youth-climate-strike/?fbclid... Read more

Forum topic

We have another great class of COTE Top Ten winners—congratulations to all of you with recognized projects. Join us on May 10 at 2:00 pm Eastern time for an inside peak at many of this year’s winners, along with insights from jurors. CLICK HERE TO REGISTER.

To keep things open and honest we won’t be recording this session. This “safe... Read more

Forum topic

Hey all - sorry I won't be able to join our call today. I had a client request an emergency meeting today (boo) because corporate mandated that they eliminate fossil fuel use from all their buildings (yay!) by 2025 and they've got a project underway that needs to pivot quickly. 

Had I been able to join, I wanted to share this in case... Read more

Quiz

Welcome to the quiz portion of Cladding: More Than Just a Pretty Façade

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Explain how different commercial wall assemblies handle moisture.
2. Know what questions to ask to determine a cladding system's environmental impact.... Read more

Forum topic

Has anyone had experience working with Hyper Metro (http://hypermetro.co/)? If so, did you find this company to provide value especially in dense urban environments where on-site segregation poses challenges to manage multiple C&D material streams on site? Hyper Metro claims to be able to provide rebates and to pay us for our trash.

Forum topic

Hi Green Gurus, 

I am happy to join this group, and would like to share a short introduction of myself. I’m Jais, and I am with FXCollaborative as a Sustainability Design Specialist working with Ilana Judah. I have been here little over a month and am enjoying it so much! 

I have studied architectural design focused on... Read more

Forum topic

We are in the process of working with our ops people to figure out billability targets for my team. Something that may be useful is the firm survey that BG conducts before each retreat (See attached image). These are great, but it varies depending on which firms attend the retreat. Its also hard to tell (in some cases) which green dot is... Read more

Forum topic

Hi folks!

Do you have examples or case studies of projects with compelling examples of circularity/salvaged material reuse? We’re looking to go beyond the examples we've seen of furniture reuse or creating art from salvaged material, and we’d like to collect some examples to get our client excited about the possibilities in a deep... Read more

Product Guide

CEUs are available for reading our entire plumbing guide. Click here to learn more and take the quiz.

Excess heat generated by air conditioners, refrigerators, boilers, and water flowing through pipes typically goes unused.

BuildingGreen-Approved Water Heat Exchangers

BuildingGreen lists desuperheating technologies and... Read more