BuildingGreen Report

Forum topic

Hi All, I was initially reluctant to share this, but I've seen similar posts and I think it's in line with our mission and interests so I'll go ahead with it.

Tomorrow 12/9 at 1 PM EST I'm moderating a panel of industry leaders in public health (as it pertains to buildings), construction finance, and project development to review the... Read more

Forum topic

Hey group,

I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.

The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more

Team Group

Forum topic

Green Gurus -

I’m honored to be co-chairing, along with Caryn Brause FAIA, the ACSA/AIA Intersections Research conference at UMass Amherst October 2023.   The theme, "Material Economies," was developed with an eye for inclusivity for academics and practitioners alike, addressing critical emerging issues around architectural material... Read more

Forum topic

Hi friends,

We recently tracked our water consumption on site during the structural demolition of some existing reinforced concrete buildings.  The new OSHA silica regulations required us to keep dust to virtually zero, so we had a bunch of mist cannons and water hoses pumping water around the clock.  We consumed ~855,000 gallons in a... Read more

Forum topic

Team,

As you all probably saw, Boston is discussing using both CEI (carbon emission intensity) and EUI as basic scope of work.  Maybe the more surprising thing is China announced a new building code next year to include carbon emission analysis as a basic scope of work for all buildings.   New buildings in 2022, among other things,... Read more

Forum topic

Hello there, 

I am working on a project with indoor plants and active green walls. I would like to design lights for growing plants and people at the same time (which seems to be a non-obvious problem). 
 

I was thinking of Philips, GE, Shneider Lighting, etc. Would you recommend someone I could talk to and eventually engage... Read more

Quiz

This pre-summit workshop was pre-approved for 6 AIA LUs and 6 GBCI CE hours.

Please complete the survey question to confirm your attendance and receive your CEUs.

By providing your credential numbers in your profile, you will enable us to automatically report these CEUs to the organization. Please check your profile to be sure... Read more

Forum topic

Love the profile of Anica as the "featured member" on AIA's website--congratulations, Anica!

It's great to see the "just do it" attitude to achieving the 2030 goals: "We do not rely on clients to tell us to design a high-performance building; we are going to do it anyway, it's our job."

Product Guide

Depending on seating type­­, these products can contain PVC, toxic flame retardants, hazardous adhesives and finishes, and other unsustainable materials.

BuildingGreen-Approved Seating

BuildingGreen’s seating meets ONE of the following sets of criteria:

is certified to BIFMA’s level 3 standard and, where applicable, contains... Read more

Forum topic

Hello Green Gurus,

Here's another Peer Networks Webinar for September, Prospects for Sustainable Buildings in Congress. We hope you will join us!

Reminder: This webinar is for Peer Networks members only.

I'm waiting to confirm with the presenters whether this will be recorded. Watch this space for updates!

Register... Read more

Forum topic

Green Gurus –

Clark Brockman brought to our attention an important and impactful opportunity to advance building decarbonization through the US Department of Energy’s proposed rulemaking around water heater efficiency, advancing adoption of heat pumps, while still providing exceptions (and efficiency targets) for electric or natural gas... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

We are working on a multi-family project in Hartford that is townhouse style so each unit has an exterior door. The client has requested electronic key fob hardware. Has anyone had experience with retrofitting a passive house door with electronic hardware or have they used a door that is already fitted with electronic hardware? 

Forum topic

Hi MEP Leaders,

We had a great conversation in our last monthly call about the function and purpose of this group, and what we can best do together. You can see detailed notes from that call here. And we'll soon be sending out a reminder about the October call (Tuesday, Oct 8, 2pm eastern).

One of the ideas from that conversation... Read more

Quiz

Welcome to the quiz portion of Passive Solar Heating.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Explain the three classic approaches to passive solar.
2. Understand the relevance of passive solar today.
3. Describe some key elements of passive solar design.
... Read more

Forum topic

Hi folks,

USGBC has commissioned this survey of the building industry about Federal tax incentives for building efficiency. They will be sharing results with congressional staff, so this might be a good opportunity to give them feedback from the field!

And it's just 10 minutes.

And, after you do the survey if you want to... Read more

Campus-wide Group