BuildingGreen Report

Forum topic

We are attempting to use Tally on a couple projects and are wondering how others are using the tool in their design process. If any experienced users out there would be willing to have a brief phone conversation I would appreciate it. Thanks

Forum topic

Hi- Happy Monday!  

Does anyone know if there is an open-source list of manufacturers that have take-back programs? Looking for a summary/spreadsheet with details (costs, qty, etc). I have a small list but I'm guessing there is already one out there...

Also, Doesn't stage D in LCA account for take-back programs? Could this be... Read more

Forum topic

Hey Gurus. Might anyone have experience, or thoughts, with regard to establishing an energy use baseline for a new advanced manufacturing facility we are working on for a regional technical community college? This type of academic facility is so relatively new, the program doesn't fall into the typical "College/University" building type from ... Read more

Forum topic

Hi everyone, 

Thank you so much to the SDL members who attended the Summer 2023 Summit! We had an amazing time with you there. A big thanks as well to the attendees who shared 5-minute presentations during the summit.

Below are some of the slides for the presentations. Please note that we have permission from all of these... Read more

Forum topic

Anyone else having this experience? We've got a LEED 2009 Core/Shell project that we've now been contracted to do a fitout within for one of the first tenants. If anyone else has had this experience and is willing to talk with me about how your process for it has gone, I'd be fantastically grateful.

Find me directly at awilson@asg-... Read more

Forum topic

Hi Folks, anyone in Boston (or willing to move) this could be a super cool opportunity for you! 

https://careers-bpda.icims.com/jobs/1557/senior-resilience-design-reviewer/job?mobile=false&width=805&height=500&bga=true&needsRedirect=false&jan1offset=-300&jun1offset=-240

Forum topic

Something we seem to be seeing a lot in our market recently are projects split into multiple packages - footing / foundation, C&S, and then later a TI package of CD's... mostly in an effort to speed up permitting and construction schedules. (Oftentimes with a contractor on board for a design / build approach). 

My question to the... Read more

Forum topic

Hi Everyone!

I'm Lauren Shumaker and I'm a Project Manager/Sustainability Manager with Turner Construction.  As a long standing advocate for healthy and sustainable building materials, I look forward to expanding my ability to promote material transparency and shine a greater light on our ability to positively impact human and... Read more

Forum topic

Well done and rivhly deserved, brother.  That makes you a Fellow Squared.

Forum topic

Hi everyone,

We're hoping to do some building monitoring as part of Building Use Evaluations on our built work, starting with projects in East Africa, to ensure they are performing as intended and to keep supporting our partners. Ultimately we want to be able to log light, noise, temperature, humidity and CO2 concentration. This does not... Read more

Forum topic

I'm wondering if people are seeing any increase in WELL or Fitwel certification interest? Or any other 3rd party systems aimed at health and wellness? WELL seems like a higher bar and now WELL v2 offers more flexibility. Is interest and adoption of 3rd party health and wellness certs growing? 

Forum topic

Hi All:  We are in the design phase for a 5,700 SF project in NH. The team is taking care to drive down embodied carbon where possible. It will be NZE.

A1-A3 emissions are coming in at 67.15 kgCO2e/sf, of which 11.97 kgCO2e/sf is a hot spot attributed to permeable paving and concrete pavers (a little skewed, since lot and patio sizes... Read more

Peer Network Event

Quiz

Welcome to the quiz portion of How to Succeed with the Living Building Challenge: 12 Teams Share Tips.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Prepare for LBC imperatives.
2. Structure an LBC process around absolute goals, with proactive leadership and follow-through... Read more

Product Guide

Untreated rainwater leaving a developed site is effectively a chemical spill, laden with pollutants that include oil, sediment, heavy metals, nitrogen, and phosphorous. The heat carried by stormwater is also harmful to fish and other aquatic organisms.

BuildingGreen-Approved Systems

We approve systems that:

are designed to... Read more

Forum topic

All,

Beck is making great strides in our AIA 2030 Commitment and we are looking for an experienced energy modeler to join our team, please reach out if you know of anyone that is looking and has energy modeling experience.  the job is posted on our website:  https://beckgroup.applicantpro.com/jobs/1011136.html

Forum topic

Hi folks,

We’re working on the agenda for what’s shaping up to be a really awesome Summer Summit at a great new venue in Massachusetts. There is an awesome group already registered, and we’d like to fill the remaining slots soon so that we can develop the agenda with your input.

If you’ve been planning to register, please do it... Read more

Forum topic

Hi All,

I wanted to pass on a few cool things we have going on at Built Environment Plus (formerly USGBC MA)  I really am conscious of not spamming you often and reserve posts for some of our most exciting happenings.

August 5, Building Tech Forum/MaterialsCAN: Getting to Zero with Embodied Carbon. Featuring 13 5-minute... Read more