BuildingGreen Report

Campus-wide Group

Forum topic

Does anyone know about temporary flushout equipment that could be used to augment a building's systems to get additional CFM of OA during construction?  For our non-laboratory type projects the flushout period ends up being too long, especially in either humid summers or frigid winters (Pennsylvania).

Hoping that some of you on either... Read more

Forum topic

We are cautiously rekindling the age-old debate: how are we balancing modeling software for design /visualization and performance analysis during early phase of design.  

We are heavy SketchUp users for early design, and most of our staff have access to COVE tool for early performance analysis. Problem is, I’d rather use Revit to COVE... Read more

Forum topic

Does anyone have a recommendation for software that helps organize and track product and material selections for projects? 

Thanks!

Forum topic

I'm exploring the use of phase change material for a project. Specifically, looking at the BioPCM/ENRG Blanket product. I see on their website that ZGF used it at University of Washington. I'd love to hear any feedback from folks who have used it, and more specifically how your energy model and MEP engineer accounted for it. Thanks!! https://... Read more

Forum topic

Was anyone else surprised to see ASHRAE 228-2023 using eGRID Subregions for both the Regional Electricity Source Energy Conversion Factor and Regional Electricity Greenhouse Gas Emission Factors? In the past I have used eGRID sub-regions but also State and local utility conversion factors depending on what energy or operational carbon story I... Read more

Forum topic

Hi Green Commons,

It’s been eerily quiet here since Tuesday night. I’ve been quiet mostly because I just didn’t know what to say. The election results are certainly a blow to pretty much everything we’ve been working for. There is so much we don’t know about things might play out, but I’m feeling a range of emotions ranging from... Read more

Product Guide

Lighting can be inefficient and have poor quality, short lifespans, and toxic ingredients.

BuildingGreen-Approved Replacement Lamps and Lighting

BuildingGreen approves a variety of replacement lamps and lighting, including:

Energy Star-qualified LED replacement lamps (or light bulbs), including A19 Edison, screw-in products... Read more

Forum topic

Anyone else having this experience? We've got a LEED 2009 Core/Shell project that we've now been contracted to do a fitout within for one of the first tenants. If anyone else has had this experience and is willing to talk with me about how your process for it has gone, I'd be fantastically grateful.

Find me directly at awilson@asg-... Read more

Forum topic

Does anyone have an idea when the AIA Materials Pledge Reporting Framework will be available? Or is there a draft of what it looks like? 

BWBR is on a push to refine our approach towards materials. As AIA Material's Pledge signatory, we were hoping to incorporate the reporting framework into our efforts. Trying to get a sense of the... Read more

Forum topic

Has anyone worked with Vidaris for LEED certification and have a contact there? If you want to direct email me with feedback on the experience that would be helpful as well.

Team Group

Forum topic

Dear all,

A mechanical engineer on a healthcare project we are working on has asked for help in dividing the ventilation calculations between ASHRAE Standards 170 and 62.1; can anyone here help shed some light on it?

"This is the first time I am working on LEED for a hospital and I am not sure how the template wants me to show... Read more

Campus-wide Group

Forum topic

In an effort to share expert knowledge on the topic of whole building LCA, we are continuing our expert guest webinar series, addressing the topic of steel on March 19th at 1PM EDT. Michael Gryniuk PE, with LeMessurier and SE 2050, will be joining us to share his strategies for reducing the embodied carbon of steel. This webinar is particularly... Read more

Basic page

Testing web-to-lead to existing contact in Salesforce.

function timestamp() { var response = document.getElementById("g-recaptcha-response"); if (response == null || response.value.trim() == "") {var elems = JSON.parse(document.getElementsByName("captcha_settings")[0].value);elems["ts"] = JSON.stringify(new Date().getTime());document.... Read more

Author

Mary Ann Lazarus

Forum topic

Now that Ben has set up access restrictions, we have to decide what message to put on "paywall" screens. For example, on the Best Practices pages, the "Official language" tab is fully accessible, but if an anonymous user clicks on any of the other tabs they'll hit a login wall:

https://live-bituser.pantheonsite.io/best-practice/energy-... Read more