×

Error message

  • The specified file temporary://fileHbU5vd could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file00V087 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileefJAHa could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileqaXGZj could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filejCJKpE could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Quiz

Welcome to the quiz portion of Climate Change: Building Industry, You’ve Got This!

Important: This quiz covers all related articles within this topic. Scroll to the bottom of the article page to find links to all the articles covered by this quiz.

Learning Objectives
Upon completing this course,... Read more

Forum topic

We are attempting to use Tally on a couple projects and are wondering how others are using the tool in their design process. If any experienced users out there would be willing to have a brief phone conversation I would appreciate it. Thanks

Forum topic

Hello Green Gurus! 

We are planning a virtual Show & Tell and Happy Hour for Oct. 30th 7pm - 9pm ET (4pm - 6pm PT) with a Halloween theme, bring your best costumes! We will hold presentations (virtually of course!) for about the first 1 hour and 20 minutes and then will transition to some fun Happy Hour festivities, sharing, and... Read more

Forum topic

Is EV100 on your radars? We're reviewing our company leases and aleady have employee free access to EV charging at our office and jobsites by request (if technically feasible).

"With businesses owning over half of all new registered vehicles on the road, it is crucial that companies lead the shift to electric vehicles." Does your role in... Read more

Forum topic

He just posted the following on the Building Performance Knowledge Community forum:

Does anyone have a recommendation for software that is easy to use and relatively inexpensive for doing energy performance analysis at the schematic design (or before) phase?  We are looking for a tool that gives good quantitative comparisons for... Read more

Product Guide

Many wood panels are unsustainably sourced, and some have high formaldehyde emissions.

BuildingGreen-Approved Panels

Laminate panels approved by BuildingGreen:

use substrates that meet CARB Phase 2 ultra-low-emitting (ULEF) or no-added-formaldehyde (NAF) emissions requirements and contain FSC-certified wood content or... Read more

Forum topic

Hello all,

I am reaching out to this community as SMMA has a job opening for a Sustainable Design Analyst (like many of you recently posting job openings on this forum).

Here is the job posting link: https://smma.applytojob.com/apply/mah0aDkOJ0/Sustainable-Design-Analyst

Please note that this position will support... Read more

Forum topic

Hi folks,

It's here! Highlights, key takeaways, and pics from our packed few days together in Ashland, Mass. in the 2023 Summer Summit report.

From the intro:

Effectively meeting the challenge of the moment is what the world needs from us. Being grounded and energized by connections and sharing with our peers in a safe... Read more

Forum topic

Hi All:  We are in the design phase for a 5,700 SF project in NH. The team is taking care to drive down embodied carbon where possible. It will be NZE.

A1-A3 emissions are coming in at 67.15 kgCO2e/sf, of which 11.97 kgCO2e/sf is a hot spot attributed to permeable paving and concrete pavers (a little skewed, since lot and patio sizes... Read more

Forum topic

There are a number of SDL and other peer network folks talking about a potential casual meet up in association with Living Future 24 (next week in ATL).

In the interest of Julie McCoy-ing this thing into being ... 

Who: All y'all ... any Peer Network folks who are in town for LF24 (or local to ATL). 

Why: Connecting is... Read more

Forum topic

Hi all,

I see that this was a hot topic for the Winter Retreat this past year, but I am wondering how your firms manage standard materials across your practice. two aspects - standard specification items, and also designer choice materials. 

1. Do you have a spec baseline with high performance materials that you start with for all... Read more

Forum topic

Built Environment Plus (was USGBC MA- aka Meredith Elbaum's band) has organized this awesome sustainability scavenger hunt.

It's fun. It's easy. Anyone can participate from anywhere - it's all app based, and it's a great way to get energized for Earth Day or week! And it's for a good cause, a fundraiser for supportive organization. Have... Read more

Firm-wide Group

Forum topic

Our building scientist has been using Insight 360 to model daylight and document it for LEED certifications.  However, it appears that Autodesk is no longer fully supporting the tool and may eventually stop all together.  (we have not been able to run simulations for weeks due to a change to how "cloud credits" work on their end that they... Read more

Author

Quiz

Welcome to the quiz portion of Waste Water, Want Water.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Help clients make sound, holistic decisions about wastewater that take into account site, municipal infrastructure, energy goals, occupant needs, and maintenance considerations.... Read more

Forum topic

All,

Beck is making great strides in our AIA 2030 Commitment and we are looking for an experienced energy modeler to join our team, please reach out if you know of anyone that is looking and has energy modeling experience.  the job is posted on our website:  https://beckgroup.applicantpro.com/jobs/1011136.html