BuildingGreen Report

Campus-wide Group

Team Group

Forum topic

Posting at the request of Sara Bayer of Magnusson Architecture and Planning, who will soon join this group:

"In our quest to achieve Passive House EUI levels in all of our multifamily projects in a healthy manner, we are encountering pushback on the one item that is not really code min just yet (in NYC) and adds real cost:  ERV’s.  Our... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hello SCLers, 

We have heard from many of you who are in the midst of budgeting for conferences and travel for 2024. Although we aren’t quite ready to open registration for our 2024 events, we hope providing some details will help you reserve funds to join us. 

Next year, we are planning two in-person events open to SCL:

... Read more

Forum topic

I'm curious if anyone can share their strategy on indoor air quality for the return to office. Is this something that is prioritized at your firm from a wellbeing standpoint and with the current health crisis at hand? Lendlease is looking into options to safeguard our employees/occupants as we move back into the workplace and I'm researching... Read more

Forum topic

I'm looking to compile an outdoor weather station for a local project, and we'd like to add local outdoor CO2 information to our data. I usually work with Onset HOBO products, but they don't offer an outdoor CO2 sensor. Their weather stations can take data from any CO2 sensor with an analog output - does anyone have any suggestions?

Reports, Courses, Study Guides, Live Webinars

Concrete and other cementitious materials have both environmental advantages and disadvantages. As builders and designers, should we be looking for alternatives or embracing concrete over competing materials?

This special report takes a look at how these materials are made, presents the key environmental considerations relating to their... Read more

Forum topic

Has anyone done any museums in which they hired an independent QA/QC specialist? Or perhaps, your firm offers QA/QC services and experise in this area? If so, could you please reach out to me? I'm wondering what firm you used and what your experience was. Was it worth the fee?

Forum topic

Hello all, 

Any Fitwel experts out there? I have a 30,000 sf boutique hotel + spa client who would like to certify under the Fitwel rating system but Fitwel folks are telling me that no scorecard is currently available to hotel clients (can't use mulit-tenant or resi, that a hotel scorecard is under development). Has anyone used Fitwel... Read more

Product Guide

Glazing connects occupants to the outdoors, but with so many opportunities for air leakage, poor insulation, and thermal bridging, glazing is the primary weak link in building energy performance.

BuildingGreen-Approved Glazing Systems

BuildingGreen approves glazing that offers strong energy performance properties for a variety of... Read more

Forum topic

I wanted to let you all know about this Built Environment Plus Roundtable coming up on Thursday afternoon 3:00 est. We will be having a discussion around the IRA and how to implement the incentives on projects and help our clients understnad what it means for them. This is an informal setting where people can ask questions or share experiences... Read more

Forum topic

Friends,

Through AIA work I have been working with Kim Shinn from TLC Engineering. Kim is involved on the ASHRAE 209 development and has been advocating that the AIA, ASHRAE and USGBC align around this standard. Personally I think this is a good idea as I expect that this standard could easily make it's way into regulations and contracts... Read more

Forum topic

Under a high carbon scenario, most of North America will be 2 degrees C hotter by 2050. Meantime, we're designing buildings that will still be around in 2050, to codes that don't yet factor in chronic risks associated with climate change. I want to explain these risks to my colleagues; I'm hoping some of our green gurus can help answer the... Read more

Product Guide

Faucets with high flow rates waste water—not to mention the energy used to treat and deliver it to our buildings—and the additional water stresses our wastewater treatment systems.

Warnings Low-flow faucets may not be appropriate for every application. Where there are long pipe runs or large-diameter supply pipes, it can take longer for... Read more

Forum topic

Hey all,

Thanks to everyone who joined today's peer network webinar - it was great to share what our working group has been developing in the last year. This group gathered to work through a series of decision-making trees to publish some kind of relatively repeatable guidance for how to advance this conversation with a variety of owners... Read more

Forum topic

Hi everyone,

Thanks so much to those of you who presented at this years AIA Show & Tell, and thanks again to ZGF for hosting! Here are the slides for some of the presentations. Please do not share the slides outside of the networks unless they are marked "PUBLIC." Hope you enjoy!

Quiz

Welcome to the quiz portion of Video: Insights to Success on LEED-CI Certification.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Identify key changes to LEED CI 2009 (ID+C).
2. Identify the circumstances of a LEED-CI project that challenge the abilityto certify.
3.... Read more