BuildingGreen Report

Forum topic

Hello friends. On a current school project, an abuse resistant wall covering has been proposed as an alternative to our typical MDF wainscot. The proposed product has been used successfully in healthcare, and switching to it will save the project almost $1million, which is no small amount when the project is over budget and 7-figure cost... Read more

Campus-wide Group

Forum topic

Hey Everyone!

We are delighted to share a major milestone in our commitment to sustainable design. After two+ years of intensive research, refining, and internal application, NBBJ is thrilled to announce the external launch of ZeroGuide, an innovative tool for early-phase carbon estimation, now available to the entire AEC community!... Read more

Forum topic

Mark your calendars Sustainable MEP Leaders!!
Here are the details to save the date for the 2020 MEP Summit:

Date: June 9th and 10th, 2020
Location: Stantec Office in Denver, CO
Schedule Outline: Tues. 9th beginning with Lunch at Noon, ending Wed. about 3pm

Gather and learn from your peers! Share your challenges... Read more

Forum topic

Hi Gurus,

We are having a hard time sourcing a baby changing table that is free of anticmicrobial coatings. KoalaKare, the predominate manufacturer, includes Microban in both their plastic and stainless steel product options.  Does anyone have any experience with a durable, ADA compliant and readily available baby changing table free of... Read more

Forum topic

Hello Sustainable MEP Leaders!

Here at BuildingGreen we are excited and looking forward to creating a valuable and engaging online summit with you all for 2020!

You can Register Here as well as review important information. The dates to mark on your calendars are June 9 - 11, 2020.

This is a crazy time, full of uncertainty... Read more

Forum topic

Hi: SD Leaders.  It was so nice to see so many of you at Greenbuild in Chicago. By now I'm sure all have seen the announcement of the release of the Fourth National Climate Assessment Report vol 2. (https://nca2018.globalchange.gov/) It's well worth a deep read - so much important and extremely informative material. I want to draw your... Read more

Author

Forum topic

Are you or companies considering joining RE100? http://there100.org/going-100

"Companies joining RE100 make a global, public commitment to 100% renewable electricity.

To achieve this goal, they must match 100% of the electricity used across their global operations with electricity produced from renewable sources – biomass (... Read more

Forum topic

Hi All,

USGBC MA is doing a study on the cost of net zero energy buildings in MA.  I’m wondering if you all have any data to share on plug loads in ZNE projects. I’m looking for single family res, 2-4 unit residential, +/- 60 unit residential, 10-12 story office, and k-12.  The engineers have presented initial results and their... Read more

Campus-wide Group

Forum topic

Hi all,

The Sustainable MEP Leaders are assembling an industry push to expand the availability of embodied carbon data for MEP equipment. Our first steps are to send a letter to industry announcing a call to action and future educational webinars on the topic, the current draft letter is attached. In a similar manner as the... Read more

Forum topic

Hi Gurus,

LMN is embarking on a 17-part series to explore a more comprehensive carbon metric via summaries of various topics with lots of link. This dovetails with many other efforts in the industry and will reference all the best stuff that we are aware of...such as MEP 2040, SE 2050, CLF stuff, Epic tool, CARE tool, Arch 2030... Read more

Product Guide

Wood decking requires potentially hazardous preservatives and stains, and plastic waste is a significant environmental problem.

BuildingGreen-Approved Decking

Composite decking approved by BuildingGreen has at least 50% total recycled content. For plastic decking, post-consumer content has to be greater than 50%.

Health and... Read more

Forum topic

Hi Friends, 

I'm working on an SOP for construction waste management for LBC core and LBC materials petal projects and wanted to get your input on the comingled facility requirements. According to the guidelines, any waste that goes to a comingled facility must be a facility that has an average diversion rate of 80% or higher as a... Read more

Forum topic

A couple questions for this group. I know we're having a Green Commons meeting on this next week. But can anyone comment on the following questions?

-Have you or your firm split the benefit of the 179D with a client? Is this typical?

-Is prevailing wage a requirement for all 179D benefit, or does it follow the same lines as... Read more