BuildingGreen Report

Forum topic

For those of you who I haven’t met yet, my name is Amanda and I just joined the BuildingGreen team as the new Peer Networks Administrator. It’s great to be here! I’m joining BG with a background in food justice education as well as rescue animal care. All of my prior experience has involved collaborating with small teams and working towards a... Read more

Forum topic

Hi SDLs,

Do you have design experience or a unique perspective on trying to include ungendered multiuser restrooms in AEC projects? We want to hear from you.

To prepare for a co-creative workshop as a part of the Environmental Design Research Association's 53rd Annual Conference, "Health in All Places," B. Sanborn, Nicole DeNamur... Read more

Campus-wide Group

Sales page

Registration closed, this discussion took place on Thursday, May 26, at 2:00 pm

 

Smart Glass: A Live Panel Discussion—Thursday, May 26, 2:00 pm Eastern

Electrochromic glazing holds the promise of less glare and better energy efficiency with fewer moving parts. The reality is much more complicated and includes information you won’t... Read more

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Product Guide

Faucets with high flow rates waste water—not to mention the energy used to treat and deliver it to our buildings—and the additional water stresses our wastewater treatment systems.

Warnings Low-flow faucets may not be appropriate for every application. Where there are long pipe runs or large-diameter supply pipes, it can take longer for... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Has anyone used a commercial heat pump water heater for a large protect?  I have found a few manufacturers for this technology, but want to make sure this is a viable and cost approach to electrical eliminate gas on a path to all electric.

Forum topic

A couple Minnesota cities are considering adding electrification to their sustainable building policy (required for new construction receiving City financial assistance). Concerned that the market isn't ready for a full-on mandate, they are considering a more moderate approach of requiring developers/design teams to conduct an electrification... Read more

Author

Mary Ann Lazarus

Forum topic

Someone made a tombstone to mark Internet Explorer’s end-of-support date

https://www.engadget.com/internet-explorer-tombstone-175433997.html

Forum topic

First, there was Energy Use reductions

Then there was embodied carbon

Soon it will be refrigerant use/leakage calculations

…and much more

As coordinators and leaders of project teams, what does this look like for the practicing architect and our collaborators?

I have no idea. BUT I’m guessing someone is... Read more

Forum topic

Hi Gurus,

It seems odd to think about leases now, during a time when most business are giving up leases or reducing their footprints, but there are still leases going on! Please share this link to any clients of yours who might be interested and sign up yourself if you want to advocate to your clients to consider these leases!

... Read more

Campus-wide Group

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Forum topic

Hi all, 

Thank you again to those of you who attended the Summer 2024 SDL Summit! We had an unforgettable few days of learning from one another, including from our presenters.

The slides for the 5-minute presentations are below, as well as the BuildingGreen slides from the Summit. Please be aware that we have permission from all... Read more

Quiz

Welcome to the quiz portion of Whole-Building Life Cycle Analysis: Promises and Pitfalls.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define whole-building life-cycle assessment.
2. Explain what whole-building life-cycle assessment can and can't do so you can work within... Read more