BuildingGreen Report

Forum topic

Hi everyone! The CLF Boston | NE Hub and BSA are holding an embodied carbon summit and we'd LOVE to see people from this group there. 

The first version of this summit was held in 2019, and since then we've made huge strides. Through our advocacy work, state and city regulations are addressing embodied carbon in procurement and materials... Read more

Forum topic

Following up on conversation from the Fika today, Kim said the IRS is supposed to be issuing rules for tax-based (even for orgs that don't pay tax) credits by the end of first quarter.  Sounds like we all just need to be on the look out still.

Forum topic

Hi all,

We know preparations for Greenbuild are well underway for many of you. We also know that there will be many things competing for your time while you're there. Here's one more to consider! We don't have all the details solidified yet, but wanted you to know sooner rather than later for planning purposes.

We hope you’ll... Read more

Quiz

Welcome to the quiz portion of Climate Change: Building Industry, You’ve Got This!

Important: This quiz covers all related articles within this topic. Scroll to the bottom of the article page to find links to all the articles covered by this quiz.

Learning Objectives
Upon completing this course,... Read more

Forum topic

Hi there SCLers,

Hope everyone is safe and healthy. I am posting on behalf of the Steeering Committee to let you know that the Committee has now adopted a Core Purpose Statement for the SCL Group. Please give it a quick read; we will likely sit with this and spend some time internalizing what it means at the upcoming Summit. 

The... Read more

Forum topic

Has anyone used a commercial heat pump water heater for a large protect?  I have found a few manufacturers for this technology, but want to make sure this is a viable and cost approach to electrical eliminate gas on a path to all electric.

Forum topic

Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more

Team Group

Forum topic

A couple Minnesota cities are considering adding electrification to their sustainable building policy (required for new construction receiving City financial assistance). Concerned that the market isn't ready for a full-on mandate, they are considering a more moderate approach of requiring developers/design teams to conduct an electrification... Read more

Forum topic

Hello all,

I need future weather files for a project. We are looking at three years, 2050, 2075, and 2095 using two climate change scenarios, low emissions, and high emissions. I have seen ARUP's Weathershift site that uses RCP 8.5 and RCP 4.5. Are we assuming that 2.6 is not achievable? I would have used this as a low emissions scenario... Read more

Product Guide

Wood decking requires potentially hazardous preservatives and stains, and plastic waste is a significant environmental problem.

BuildingGreen-Approved Decking

Composite decking approved by BuildingGreen has at least 50% total recycled content. For plastic decking, post-consumer content has to be greater than 50%.

Health and... Read more

Forum topic

Hello! 

We have several projects that are either pending ILFI Zero Carbon certification or the owner is planning to purchase offsets to cover construction emissions. Thus far, I have not considered this in our corporate footprint reporting. However, we are including A5 emissions whenever feasible and multiplying that performance over the... Read more

Forum topic

Hello all, 

Any Fitwel experts out there? I have a 30,000 sf boutique hotel + spa client who would like to certify under the Fitwel rating system but Fitwel folks are telling me that no scorecard is currently available to hotel clients (can't use mulit-tenant or resi, that a hotel scorecard is under development). Has anyone used Fitwel... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hello SDLs!

Here is the 2018 SDL Summer Summit Report, ENJOY!

In a couple of weeks we will share this report with the broader Green Gurus group. 

We are also working on setting up a webinar to present the 2018 SDL Summer Summit Report and discuss the Summit!

All the best,

RoseAnn

Forum topic

Hello all, 

Wondering if anyone has experience with lead limits in electrical cable and wiring? 

LEED for Healthcare allows a limit of 300 ppm of lead in electrical wire and cabling - my search for compliant products has been all dead ends. (MRc PBT Source Reduction - lead, cadmium, and copper)

Acceptable regulations for... Read more