BuildingGreen Report

Forum topic

Hi all,

We have a newly constructed, core/shell project having some hot water issues in the core restrooms.

There is a 0.35 Toto lav installed throughout. The hot water heaters are adjacent on each floor, located in the janitor closets. We did the math, and there could be a gallon of water standing and cooling in the pipe between... Read more

Author

Dana Manafarm

Forum topic

Hi: Please check out the fantastic editorial from Ned Cramer at Architect on "The Future of Architecture Education is the Future of Civilization". The deadline to comment on the latest draft of the NAAB accreditation criteria is November 22 and, as in the past draft, it falls far short of prioritizing climate action and sustainability. VERY... Read more