BuildingGreen Report

Product Guide

Faucets with high flow rates waste water—not to mention the energy used to treat and deliver it to our buildings—and the additional water stresses our wastewater treatment systems.

Warnings Low-flow faucets may not be appropriate for every application. Where there are long pipe runs or large-diameter supply pipes, it can take longer for... Read more

Forum topic

Hi everyone, on our SDL Regional Leaders call today we touched on how different offices are engaging with the Youth Climate Strike on Sept 20, and I offered to share a few resources that we've developed:  

1) Here is our public-facing official statement/endorsement: https://www.vmdo.com/architecture-blog/vmdo-youth-climate-strike/?fbclid... Read more

Forum topic

Hi folks,

I hope you've seen the plug to sign onto the letter that's generated a flurry of messages on Green Gurus--I also emailed it out directly to everyone. We've got lots of architects on board, and a handful of engineers, but I think we just have one contractor so far (Thanks Theresa!)--it would be really awesome to have more.

... Read more

Forum topic

Congratulations to Mara Baum (HOK) and Alison Kwok (U of Oregon), FAIA! 

AIA announcement

Quiz

The construction sector’s take-make-waste approach to materials needs an overhaul. Materials and construction account for an estimated 11% of global greenhouse gas emissions annually. At the other end of the life cycle, demolition in the United States annually generates 90% of some 600 million tons of construction-sector debris. Getting trashed... Read more

Forum topic

Does anyone have a Passive House detailing resource recommendation? Something that is applicable to wood over podium and/or metal framing construction? I have the book below but looking for something more applicable.

Passive House Details: Solutions for High-Performance Design 1st Edition

by Donald B. Corner (Author), Jan C.... Read more

Forum topic

Hi everyone!

My awesome colleague, Paula Melton, is doing a short talk for USGC about mass timber and wants to know if there are SCLers in the group that can share their experience. In particular: 

"I’m wondering particularly about how supply-chain and cost issues are affecting availability and decision-making, and what the onsite... Read more

Forum topic

Has anyone here been involved (taken or taught sessions) in the Healthy Materials Lab Online Certificate program for Healthier Materials? 

https://healthymaterialslab.org/learning-hub/e-learning-online-certifica...

I'm thinking about having some of our staff take this course, especially those that don't have a background in... Read more

Forum topic

Hi everyone,

Just a reminder to please fill out the SCL 2024 Events Attendance Poll by the end of next Monday, December 18th. Thank you so much to those who have filled it out already! :) 

-Amanda

Forum topic

Sasaki seeks a Sustainability Coordinator for Planning & Urban Design Sustainability Coordinator with experience in planning or urban design for our Boston office, to work on a variety of college and university campuses, urban mixed-use districts, corporate campuses and resilience planning. You'll work me and with Alison Nash, our... Read more

Forum topic

Hello, All,

Does anyone have experience with cove.tool (https://covetool.com/)?  Perhaps for those projects that may not get fully modeled, or as a tool to help set baselines?  It came across our radar recently, and I'm wondering if the subscription might be worth a try.

Thanks! 

Maria

Forum topic

I am wondering how architectural firms plan to close the gap to zero in the next few years. 

Owner's dictate outcomes and the typical owner is not committed to zero - even when sustainability is a focus of the project. 

We can present solar-ready designs, all electric buildings, geothermal, etc. but there is still quite a gap to... Read more

Quiz

Welcome to the quiz portion of Video: Eight Steps to Success with LEED-EBOM.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Describe the first steps project teams should take when considering LEED-Existing Buildings: O+M.
2. Understand the steps and timeline ofthe LEED-... Read more

Forum topic

Our firm has had some clients that object to the term "Master Plan." We have removed "Master Planning" from our letterhead, where we list our capabilities and have replaced it with "Planning." Although we still find ourselves using it, old habits die hard, especially when we receive an RFP from a client asking for "Master Planning." Once we get... Read more

Forum topic

For those of you that don't know me, I'm the Director of Sustainability at the Structure Tone organization. Betting that you can guess what my role entails since you're all in similar roles and we've done the introductions a couple of times in different forums...given that I'd like to introduce myself personally.

I live in a suburb of... Read more

Forum topic

Hi All, this is primarily directed at our Sustainable MEP folks, but please anyone with insight feel free to weigh in.

I am increasingly seeing designs and specifications asking for Passive House levels of airtightness as verified by blower door testing, but with traditional ventilation system designs. 

To me, Passive House US has... Read more

Forum topic

Green gurus!

We're getting some interest from clients abroad on two specific materials which we don't have experience with here in the U.S.:

1) Cross Laminated Timber (CLT)

and/or 

2) CarbonCure concrete

Anyone willing to share lessons learned on these material either here in the forum or offline? Or point me... Read more