×

Error message

  • The specified file temporary://fileC79M2f could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileXzY6dw could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileQ5YDQI could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileqEWHf5 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file8y2unK could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

News Analysis

New EPA Recycled-Content Guidelines

On May 1, 1995, the Environmental Protection Agency issued a final rule that adds 19 materials to the Comprehensive Guideline for Procurement of Products Containing Recovered Materials.

This rule recommends minimum recycled content for various materials purchased by the government or purchased for construction projects receiving federal funding (see

Published July 1, 1995

(1995, July 1). New EPA Recycled-Content Guidelines. Retrieved from https://www.buildinggreen.com/news-analysis/new-epa-recycled-content-guidelines