×

Error message

  • The specified file temporary://fileIZ49CW could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileSGv3z2 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileWW2zX1 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileKMHRQs could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileun84tm could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Case Study

California College of Arts and Crafts

Such was the case with the California College of Arts & Crafts renovation project in San Francisco. The approach taken with heating defies conventional wisdom.

In the renovation of this 1951 Skidmore, Owings & Merrill Greyhound Bus maintenance facility, the designers expected to invest in upgrading the single-glazed, poorly insulated envelope that enclosed the large, daylit space.

Published April 1, 2002

(2002, April 1). California College of Arts and Crafts. Retrieved from https://www.buildinggreen.com/case-study/california-college-arts-and-crafts