×

Error message

  • The specified file temporary://filebvwY0M could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filev8Yt6I could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filegTnfHd could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileWRkYsE could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filelvjwMU could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

News Brief

Green-e Made with Renewable Energy Labels

The Center for Resource Solutions (CRS) is developing a Green-e label to distinguish products made with a significant percentage of green power (from solar electric, wind, geothermal, biomass, and small or certified-low-impact hydropower facilities).

In order to use the label, companies that consume more than 100,000,000 kWh of power annually must purchase a minimum of 2% renewable power. At the other end of the scale, companies that consume less than 100,000 kWh must purchase at least 15% renewable power. For all companies, at least 50% of the minimum purchase must go to new renewables—generation facilities that have come online since 1997, and in New England since 1998. Over 10,000 businesses and 110,000 households currently use Green-e certified renewable energy, and several companies, including the Interface Fabrics Group, have already applied for authorized use of the “Made With Renewable Energy” label. For more information on CRS and Green-e, visit green-e.org or see EBN Vol. 11, No. 5.

 

 

Published January 1, 2004

(2004, January 1). Green-e Made with Renewable Energy Labels. Retrieved from https://www.buildinggreen.com/newsbrief/green-e-made-renewable-energy-labels

Add new comment

To post a comment, you need to register for a BuildingGreen Basic membership (free) or login to your existing profile.