×

Error message

  • The specified file temporary://filecV8RU6 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileGPEW2N could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileILS6qA could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filevKmpsn could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://files3R1nI could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

News Brief

Rhode Island Passes Renewable Energy Standard

Rhode Island Governor Donald Carcieri signed “An Act Relating to Public Utilities and Carriers—Renewable Energy Standard” on June 30, 2004, requiring each of the state’s

electric utilities to provide 3% green power in 2007. The renewable energy requirement, which can come from solar, wind, ocean, geothermal, and certain hydropower and biomass sources, will gradually increase to 16% in 2019.

Published August 1, 2004

(2004, August 1). Rhode Island Passes Renewable Energy Standard. Retrieved from https://www.buildinggreen.com/newsbrief/rhode-island-passes-renewable-energy-standard

Add new comment

To post a comment, you need to register for a BuildingGreen Basic membership (free) or login to your existing profile.