BuildingGreen Report

Forum topic

Hello,

We are in the very early planning phase of a k-8 public school project to be designed and built in an economically challenged urban location with very limited site options. The project is not LEEDv4 registered yet.  We are at feasibility and costing the soil remediation, needless to say that we would really hope there would be... Read more

Forum topic

Just in time for Saturday Night!!

Get out the popcorn and put away Netflix!
For those who were unfortunate enough to miss this LIVE - you still get to watch the awesome talents of our community! 

You sadly miss out on the camaraderie, connection and wonderfullness of hanging out with everyone (not recorded!) but you do get... Read more

Product Guide

Replacing windows is expensive and comes with high impacts, but simple films can improve performance.

BuildingGreen-Approved Films

BuildingGreen approves three types of window films:

surface-applied films that have earned NFRC ratings and have a minimum 10-year warranty seasonal flexible-film kits bird-safety films

Energy... Read more

Forum topic

Hi all,

I wanted to reach out to fellow MEP energy modeling teams to assess everyone's experience with the new PCI calculation methodology in 2016. It was a substantial change in how we show savings on projects. Big changes can often come with un-intended consequences. I'm all for pushing to higher efficiency - just want to make sure we... Read more

Forum topic

Hey there Hive Mind,

I'm tossing a question out here as I know various compositions of us have had pieces of this conversation about how operational and embodied decarbonization has been incentivizes at state and local levels through various regulatory frameworks. I meant to do research on this topic for a project team of mine and time... Read more

Campus-wide Group

Reports, Courses, Study Guides, Live Webinars

Returning to work: for many, it’s unthinkable without some kind of reassurance that leadership and the facilities team have taken all possible precautions. Lots of organizations are weighing in on what we should pay attention to, but how do we know if it’s working?

The free Re-entry program from Arc is a tracking and measurement... Read more

Forum topic

We are evaluating Dynamic Glass - and I have always been a bit timid to use. 

Any thoughts / experience on what we should be aware of?

Thanks!

Forum topic

This would be a great place to share insights and reflections from the opening session. 

Forum topic

Howdy all,

Following up on Emily's post (https://www.buildinggreen.com/forum/aia-2030-zero-tool-vs-cbecs-baseline) on AIA2030, the folks on the steering committee's monthly call thought it'd be a good idea to do a general call for feedback on reporting this year while the bangs and bruises are still fresh. The intent is to compile the... Read more

Forum topic

I see that the Architect 50 questions this year are organized around AIA 2030 Commitment reporting. I have a question about how people are answering them. The DDX reports have percentages that are by GSF. Are people using this percentage to answer the questions? Or are you calculating the percentage based on number of projects out of total... Read more

Forum topic

I am looking for examples of adaptive reuse projects that have addressed current or future flooding by elevating floors from the existing condition.

Forum topic

This question came to me via our mutual friend Josh Jacobs, but while interesting it's a bit out of my range of expertise... 

In short, a critical materials assessment specifically focused on airbourne byproducts from a manufacturing process that would be first-of-its-kind in the U.S. 

Required Emissions Details: Link to the 48C... Read more

Forum topic

We are attempting to use Tally on a couple projects and are wondering how others are using the tool in their design process. If any experienced users out there would be willing to have a brief phone conversation I would appreciate it. Thanks

Quiz

Welcome to the quiz portion of Circular Economy at Scale: Six International Case Studies.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define circular economy and explain its importance within the built environment.
2. Describe how to leverage long-term value over first... Read more

Forum topic

Something we seem to be seeing a lot in our market recently are projects split into multiple packages - footing / foundation, C&S, and then later a TI package of CD's... mostly in an effort to speed up permitting and construction schedules. (Oftentimes with a contractor on board for a design / build approach). 

My question to the... Read more

Firm-wide Group

Forum topic

I've been hearing recommendations for bipolar ionization, as a way to filter airborne virus particles in HVAC systems while avoiding the energy penalty of increased ventilation. However, I've also heard that ionizing equipment is dangerous because it produces ozone.

Does anyone have any insight into the effectiveness and/or cautions... Read more