Forum topic
On LEEDuser we divide checklists into multiple project phases. Specifically:
Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic designHow many of these phases are relevant for BIT best practices?
Note that we also... Read more
Forum topic
How interested are you in a Sustainable MEP Leaders Summit this summer?
Please respond to this poll ASAP, as we need to gauge interest before we finalize any details.
When: Wed. July 26 at noon to Thurs. July 27 at 1:30.
Where: At a conference facility near Boston
Cost: $1200, which includes lodging, meals, and... Read more
Forum topic
I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade. They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design. The products they're looking at claim... Read more
Forum topic
Hi all,
I'm curious how various firms are approaching their own office projects, re green building certifications. I'm especially interested in medium-large firms that have multiple offices, but policies and processes from small firms may still be instructive.
Do you have a firm-wide policy or is it a case-by-case thing? Has... Read more
Forum topic
Hi all,
Internally in our organization, we seem to have plenty of horizontal (infrastructure) resiliency expertise, but I'm finding the vertical resources to be lacking. I'm hoping to build a collection of beginner- to intermediate-level resources to help guide practice/design standards for our reference. Any pointers on good info... Read more
Forum topic
Hey group,
I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.
The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more
Product Guide
Board insulation has good thermal performance ranging from about R-4 to R-8 and is used as an integral part of a building envelope’s continuous insulation system.
Because board insulation is used on the building exterior, it is not always subject to the same material health and emissions requirements as batt insulation used inside the... Read more
Forum topic
Hi SDLs,
Do you have design experience or a unique perspective on trying to include ungendered multiuser restrooms in AEC projects? We want to hear from you.
To prepare for a co-creative workshop as a part of the Environmental Design Research Association's 53rd Annual Conference, "Health in All Places," B. Sanborn, Nicole DeNamur... Read more
Quiz
Welcome to the quiz portion of Energy Modeling: Early and Often.
Learning Objectives
Upon completing this course, participants will be able to:
1. Explain how energy codes and standards are pushing commercial projects beyond what they can do without modeling.
2. Describe the energy and cost-savings benefits... Read more
Forum topic
We are looking at installing an aerobic biodigester in a commercial kitchen for an office client that is VERY concerned about zero waste. Basically, this system takes food waste, treats it with micro-organisms to remove organic matter, and turns it into water of high enough quality to go straight to the sewer. The manufacturer we are looking... Read more
Forum topic
HGA is seeking a Sustainable Materials Specialist to join our team!
The role involves working with project teams to educate, research, and support decision-making related to sustainable materials and, in connection with sustainability experts across the firm, developing resources and tools to elevate HGA’s materials baseline.
The... Read more
Reports, Courses, Study Guides, Live Webinars
THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.
Hot spots: they might sound like fun places to hang out and have a drink—but in green building, they’re actually a bad thing. Something you track down so you can get rid of it. Kind of like being an environmentalist bounty hunter.
Life-cycle assessment (LCA) is... Read more
Forum topic
Hi all,
As you know, the Carbon Leadership Forum has been busy in recent years growing the tent of discipline-based commitments for reducing embodied carbon. SE 2050 and MEP 2040 provide the platform and commitment for structural and MEP respectively, and there is now interest brewing for an additional commitment in support of civil... Read more
Forum topic
Hi all - I heard from sevearl of you at Greenbuild that you have learned from and perhaps even shared the Path To Zero Carbon series internally at your firms and externally. As I mentioned at Greenbuild, we are attempting to hand off the series to a non-profit, with the idea that groups of experts (including many of you, I hope!) will provide... Read more
Forum topic
We have an increasing number of projects, where the client is coming to us with "net zero" aspirations and plans, some of which don't fit the typical all-electric, grid-tied building that produces 100%+ of its annual energy use on-site. There include examples like:
1) A (targetd) living building that maximizes on-site production, with... Read more
Forum topic
Love the profile of Anica as the "featured member" on AIA's website--congratulations, Anica!
It's great to see the "just do it" attitude to achieving the 2030 goals: "We do not rely on clients to tell us to design a high-performance building; we are going to do it anyway, it's our job."