BuildingGreen Report

Forum topic

Hi there SD Leaders,

We're running an LCA on one of our projects that's about to start construction that has had serious embodied carbon goals and I got a result that really surprised me. I haven't been able to find any obvious/glaring issues with the work, but these results are strange enough that I'm not feeling confident. I'm hoping... Read more

Forum topic

All,

The current version of the program manual includes ID numbers for the best practices, as shown below. I know we want to keep a quick reference number or ID, but though it would be worth asking if we want to use the below, reorder them in some way, or use a different kind of ID. Opinions?

Thanks,
Jenny

--------... Read more

Forum topic

Hello, All!  I'm hoping for your help to keep a green roof on a project of ours.  We have a large healthcare project in the Midwest that is coming in over budget.  To avoid losing our extensive green roof, I'm looking for alternate sources of funding - grants, private sources, etc.  Has anyone gone down this path before and have shareable... Read more

Forum topic

Join your peers and BuildingGreen February 22–26, 2021 for an all you can eat buffet week of networking, problem solving, and connecting with sustainability leaders within your industry and across the Peer Networks! During this week we will create a space for you to offer and receive support, exchange ideas and resources, and become stronger,... Read more

Product Guide

Caseworks can be made from unsustainable wood and other materials, and with adhesives and finishes that offgas formaldehyde and other hazardous compounds.

BuildingGreen-Approved Casework

Approved caseworks are:

made from FSC-certified wood or rapidly renewable materials verified as low emitting using CDPH Standard Method or a... Read more

Quiz

Welcome to the quiz portion of Deep Dive into the Integrative Process with Marcus Sheffer (recorded webinar)

Learning Objectives
Upon completing this course, participants will be able to:


Define “integrative process,” understand its role in LEED BD+C v4 and v4.1, and leverage its power to promote advanced sustainability goals... Read more

Forum topic

Hello Everyone,

Here is the 2019 SCL Demographics Report, thank you to everyone who submitted responses. Enjoy!

The SCL Salary Survey Report will be coming next and please note that the Salary Survey is only distributed to those who participated.

All the best,

RoseAnn

Team Group

Forum topic

All,

I'm looking for a quick methodology to estimate GHG emissions from refrigerants on a per SF basis. Are there any benchmark studies or quick calculators similar to the embodied carbon study? https://carbonleadershipforum.org/embodied-carbon-benchmark-study-1/

Thanks,

Josh

Campus-wide Group

Forum topic

We've put together an infographic that offers a brief rundown of a bunch of programs and tools that help firms promote equity. The idea for this came out of the SDL Winter Summit, so thanks to those who were there and pushed us to create this resource!

https://www.buildinggreen.com/infographic/equity

Forum topic

Asking for a colleague:

"Have you ever had a large number of fire retardant tarps used to temporarily enclose a building during construction? Do you know of any solutions for recycling/reusing them or another product that doesn't use toxic fire-retardants that meets the performance criteria?"

I think we've all seen poly or fabric... Read more

Forum topic

I've been seeing Armstrong's DC flexzone ceiling system at Greenbuild for many years. I'm working on a net zero project with LED lights and solar panels. In theory, the transmission losses in going from DC power from panels to AC for the building to DC for the lights would be eliminated. But does anyone actually have experience using this... Read more

Author

Amal June Polt

Forum topic

I'm sure most (if not everyone) is aware that LEEDv5 is under public review until May 20, 2024. I know I need to make time to flip through it, review, and comment, but I'm having a heckuva time protecting the time in my calendar to do that. Anyone interested in joining me for a 60 - 90 minute meeting to do this together as an accountability... Read more

Forum topic

Dear All!

Crowdsourcing here to see if anyone has access to two LCA's that can be used to compare functionally equivalent consumer products: a fossil fuel powered to a battery one?  (A good product might be a car or stove, or a heating system with a boiler compared to a heat pump, perhaps?  Needs to include the B-use phase probably...)... Read more

Forum topic

Hi everyone! I'm extremely pleased to be back in this group after a couple of years out and I'll spare no time in spamming your inboxes. 

MASS is working with UT Austin to help them evaluate their campus buildings for reuse firstly and then deconstruction and material reuse. Their campus, as with most campuses, is constantly being built... Read more

Campus-wide Group

Forum topic

Hi SDL: Check out this great interview with Paul Hawken and  COTE members Gunnar Hubbard and Kira Gould. Lots of inspirational ideas about the importance of the built environment in carbon drawdown: 

Here's that link---

https://www.architectmagazine.com/technology/aia-cote-in-conversation-with-paul-hawken_o

thanks.

... Read more