Forum topic
Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.
Reports, Courses, Study Guides, Live Webinars
THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.
Tue, Oct 9th, 2018 2:00 PM - 3:00 PM EDT (11:00 AM - 12:00 PM PT)Glazing is by far the most complex single component of our enclosures and it must be climate-tuned to boot. Getting the amount, the location, and the performance attributes of glazing is key to... Read more
Forum topic
Hello, Green Gurus!
It was lovely to see some familiar faces (and names) in this afternoon's webinar about Low Carbon Specs. A little personal info, but I have just recently returned from maternity leave, and plugging back in to this network of passionate sustainability professionals is one of the things that actually made me look forward... Read more
Forum topic
A couple Minnesota cities are considering adding electrification to their sustainable building policy (required for new construction receiving City financial assistance). Concerned that the market isn't ready for a full-on mandate, they are considering a more moderate approach of requiring developers/design teams to conduct an electrification... Read more
Forum topic
Is LEED Online mind-numbingly slow today for anyone else? Or is it just me? I may give up and try again tomorrow. Frustrating as I was hoping to submit a final review today. :(
Forum topic
Hi everyone,
We're pitching a green wall to a client for a project in NYC and are looking for recommendations on systems/companies. We've done them locally, but the company we've worked with only services the Boston area. There are so many companies out there now that we'd rather go with one that's recommended. Thanks in advance for... Read more
Forum topic
I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade. They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design. The products they're looking at claim... Read more
Forum topic
Hi Gurus,
It seems odd to think about leases now, during a time when most business are giving up leases or reducing their footprints, but there are still leases going on! Please share this link to any clients of yours who might be interested and sign up yourself if you want to advocate to your clients to consider these leases!
... Read more
Quiz
Welcome to the quiz portion of Finding Furniture Without Toxic Flame Retardants.
Learning Objectives
Upon completing this course, participants will be able to:
1. Explain why avoiding toxic flame retardants is important.
2. Explain how we were swindled into dosing our buildings and our bodies with flame... Read more
Peer Network Event
Forum topic
Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.
As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more
Forum topic
Hello all,
I need future weather files for a project. We are looking at three years, 2050, 2075, and 2095 using two climate change scenarios, low emissions, and high emissions. I have seen ARUP's Weathershift site that uses RCP 8.5 and RCP 4.5. Are we assuming that 2.6 is not achievable? I would have used this as a low emissions scenario... Read more
Forum topic
On LEEDuser we divide checklists into multiple project phases. Specifically:
Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic designHow many of these phases are relevant for BIT best practices?
Note that we also... Read more
Author
As Building Green’s Finance Manager, Ashleigh is responsible for the development and analysis of financial strategic plans, operational budgets, and the development and analysis of associated performance indicators. Additionally, in her day-to-day she oversees all areas of finance including: payroll, accounts payable and receivables, project... Read more
Forum topic
Hello, fellow SDLs,
I wanted to share an opportunity for you - or those in your network - to join a passionate team of architects and designers based in Anchorage, Alaska. I'm told that you'd be asked to join the full team in Anchorage a few times a year for team building events but otherwise you can WFW (work from wherever!).
I... Read more
Forum topic
Hey group,
I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.
The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more
Forum topic
Resilience Resource Database
The Defining and Measuring Resilient Outcomes Working Group has been developing a Resilience Resource Database as a repository for resources related to the topic of resilience in our built environment.
This database and map are endeavoring to show resources for resilient design across the country to... Read more