Forum topic
We have an increasing number of projects, where the client is coming to us with "net zero" aspirations and plans, some of which don't fit the typical all-electric, grid-tied building that produces 100%+ of its annual energy use on-site. There include examples like:
1) A (targetd) living building that maximizes on-site production, with... Read more
Forum topic
All,
We are collecting examples of buildings that involved electrification initiatives (building does not need to be all electric as long as largely electric). Please share your projects with us through this short survey. It will take 8-10min to complete.
The study will culminate into a report and best practices to advocate for... Read more
Basic page
Forum topic
Hello Sustainable Community Design Leaders,
Now that everyone invited to the SCDL calls has access to this forum, I want to shift us over here for announcements and reminders, so here's your reminder that this month’s call is next Monday, March 21st, 11am–12pm ET (8-9am PT). Back to our usual time!
You can view the agenda here.... Read more
Forum topic
Hi All,
I just became aware of the attached detail (if I uploaded it correctly) for a project in Portland, OR going out for permit at the end of this week. Has anyone located the radiant tubing at the bottom of concrete like this before? It doesn't sit right with me, though I cannot pinpoint exactly why. Our consultants and the... Read more
Forum topic
Hi everyone,
We’re so excited to announce that registration for the first-ever “Summit for the Sages” is live! Register here and save your seat to join BuildingGreen, your Sages peers, and members of all three other networks in Omaha this Summer.
If you are in Sages and SDL and want to attend both summits, please check the “SDL... Read more
Forum topic
For those of you who I haven’t met yet, my name is Amanda and I just joined the BuildingGreen team as the new Peer Networks Administrator. It’s great to be here! I’m joining BG with a background in food justice education as well as rescue animal care. All of my prior experience has involved collaborating with small teams and working towards a... Read more
Quiz
Welcome to the quiz portion of Why High-Performance Assemblies and Why Now? (recorded webcast)
Learning Objectives
Upon completing this course, participants will be able to:
1. Understand how water moves on and through buildings.
2. Describe the details of continuous air, water, and thermal barriers and... Read more
Forum topic
Please share your thoughts in preparation for our monthly call this Thursday (call info below).
Given these items that are changing at AIA, are any of them motivating changes within your firm? If so, how? If not, why?
1. Awards criteria now includes COTE Measures of Design Excellence
2. Code of Ethics now includes rule on... Read more
Forum topic
Within the confines of the BuildingGreen safe space, I wanted to share the Forced Labor in the Building Material Supply Chain Mitigation Framework I shared at the 3/1 First Friday Fika. The intent is for this document to become public, but we are working through some permissions and final editing logistics. The project was collaborative... Read more
Quiz
Sustainability leadership has requested that you take this quiz to help assess sustainability literacy across the firm. Your own results will be presented to you at the end of the quiz but will not be shared with anyone else. Only aggregated, anonymized results will be available to others.
Please don’t do research to inform your answers... Read more
Product Guide
CEUs are available for reading all the building-envelope product guides and primer. Click here to learn more and take the quiz.
Vapor retarders are meant to protect our building assemblies from getting wet, but they can also slow drying, contributing to mold and structural degradation.
BuildingGreen-Approved Vapor Retarders
... Read moreForum topic
Has anyone worked on a WELL project? I have heard that you can expect about 1.5 to twice the effort of LEED coordination but wasn't sure how accurate that was. Any suggestions for determining the possible time commitment of WELL coordination?
Thanks in advance!
Forum topic
Hi! Just saw this White House press release stating that federal suppliers will need to report on scope 1 & 2, and relevant scope 3 emissions and climate-related financial risks as well as set science-based emission reduction targets. The cutoff for disclosure requirements is $50m in federal contracts. Curious whether this affects any... Read more
Forum topic
At our SAL call today, folks were talking about how there was just too much to read about DEI. This is the best short summary I have read about the problems of incorporating it into the organizations where we work. It's much easier to talk the talk than to walk the walk because it takes time and accountability.