×

Error message

  • The specified file temporary://fileVIEpwI could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file6BGhoB could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file820h87 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileOPgX3D could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filea4a9Ur could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Forum topic

Hey all - sorry I won't be able to join our call today. I had a client request an emergency meeting today (boo) because corporate mandated that they eliminate fossil fuel use from all their buildings (yay!) by 2025 and they've got a project underway that needs to pivot quickly. 

Had I been able to join, I wanted to share this in case... Read more

Forum topic

Has anyone had experience working with Hyper Metro (http://hypermetro.co/)? If so, did you find this company to provide value especially in dense urban environments where on-site segregation poses challenges to manage multiple C&D material streams on site? Hyper Metro claims to be able to provide rebates and to pay us for our trash.

Forum topic

As part of the Philadelphia AIA COTE, we have been proposing implementing sustainability in some fashion into the design awards with our chapter's design committee.  I know that many of you have been down this road before, and wanted to get your feedback at a high level about what your local COTE is doing.  Anyone who's interested, can you... Read more

Team Group

Basic page

BuildingGreen Approved, like its predecessor, GreenSpec, is an independent product evaluation service for BuildingGreen members. We offer an unbiased look at products: BuildingGreen does not accept any manufacturer fees for our evaluations. Here’s a quick tour of the platform and how to use it.

Who can access BuildingGreen Approved... Read more

Forum topic

Hello Everyone,

As the staff here at BuildingGreen prepares for our third peer network summit in two months, we'd like to share out the Summit Report from the first online summit with the Sustainable MEP Leaders. We're a little delayed in sharing this with the wider Green Gurus group, but there is still plenty of time to review before... Read more

Forum topic

Hi everyone! I saw that BuildingGreen won't be faciliating a meet-up in Atlanta but are there any other peers attending Living Future next week and want to self-organize? If we can find a venue - i wonder if there are any locals on this list with a recommendation? Could do Wednesday 7-8:30 between the two scheduled reception and after-hours... Read more

Forum topic

Our firm has had some clients that object to the term "Master Plan." We have removed "Master Planning" from our letterhead, where we list our capabilities and have replaced it with "Planning." Although we still find ourselves using it, old habits die hard, especially when we receive an RFP from a client asking for "Master Planning." Once we get... Read more

Campus-wide Group

Quiz

Welcome to the quiz portion of Take Control of Your Materials: Four Empowering Lessons from Teams That Beat the Red List.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Customize a framework to prioritize goals and simplify complex material decisions.
2. Use a red-list... Read more

Forum topic

Hi All, this is primarily directed at our Sustainable MEP folks, but please anyone with insight feel free to weigh in.

I am increasingly seeing designs and specifications asking for Passive House levels of airtightness as verified by blower door testing, but with traditional ventilation system designs. 

To me, Passive House US has... Read more

Peer Network Event

Forum topic

Hello - I seem to remember a thread on Sustainable Design Specialist / Advisor - Focused or Integrated Position within a firm. Does anyone remember the subject header or did I just dream this up? My searches are coming up empty...

Thanks!

Mona

Mona Lemoine, Architect AIBC, MAA, MRAIC, LFA, LEED AP BD + C

Senior... Read more

Forum topic

Hello friends,

We are embarking on calculations to quantify avoided embodied carbon from converting an old school building into a multifamily project and I wanted to vet our methodology with you.

Our idea is to first establish a benchmark for a new replacement multifamily building based on published studies. We have found a few... Read more

Forum topic

HGA is collaborating with the University of Minnesota Climate Adaptation Partnership (MCAP) to research how the AE industry is currently using climate projection data, and what they need in order to grow their use of data. MCAP is currently producing a set of dynamical downscaled climate projections for the state of Minnesota and unlike other... Read more

Author

Lisa Richmond

Product Guide

Engineered wood efficiently utilizes fast-growing, small-diameter trees.

When sourced from responsibly managed forests, engineered wood can store carbon that would otherwise enter the atmosphere, and can replace high-embodied-carbon concrete and steel in some structural applications.

Engineered wood products can also provide a... Read more

Forum topic

Since attending the SDL Summer Summit this year, I've continued soul-searching for more actionable firm-wide, walk-the-talk Climate Initiatives to push forward and sheepishly realized that our office operational emission accounting (and potential offsets) has literally fell off the radar. Since 2008.
:(

So my query:
1. Are... Read more

Forum topic

Hey y'all,

Since it's now past September 8 when reporting was due, I'm thinking all those that were going to report as part of this round have now done so. I know AIA will assemble an industry-wide report, but I'm also very interested in the less polished conversation that allows all of us to trade experiences and just see how this went... Read more