BuildingGreen Report

Forum topic

I'm so excited to share that the call for submissions is now open for 16cubits, a design festival and competition for the Jewish holiday of Sukkot, to take place at Berkeley’s Urban Adamah in October 2024.

Please share with anyone you think might be interested! Our hope is to create a forum for builders, designers, and architects to... Read more

Author

Kelly provides administrative support to BuildingGreen projects, including major contracts as well as event planning, and logistics coordination for BuildingGreen’s network of sustainable design leaders. Among her projects, Kelly coordinated a large tri-state regional economic development project focused on the green goods and services industry... Read more

Sales page

 

 

Join Brent & Alex to learn what's new and what's been updated in our BuildingGreen Guide to Thermal Insulation, Fourth Edition, including what you should know about:

Performance Health Environmental considerations Building science

So much has changed so quickly!

Our 30-minute roundtable... Read more

Forum topic

Hi,

Has anyone used a sustainable product that complies with the EQc Low-Emitting Materials requirement that is a general construction adhesive similar to Liquid Nails? I've checked the Mindful Materials website and can't find anything. I found Red Devil General Prupose Construction Adhesive on UL Spot, but have never used it before. Any... Read more

Quiz

Welcome to the quiz portion of Video: Insights to Success on LEED-CI Certification.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Identify key changes to LEED CI 2009 (ID+C).
2. Identify the circumstances of a LEED-CI project that challenge the abilityto certify.
3.... Read more

Quiz

The construction sector’s take-make-waste approach to materials needs an overhaul. Materials and construction account for an estimated 11% of global greenhouse gas emissions annually. At the other end of the life cycle, demolition in the United States annually generates 90% of some 600 million tons of construction-sector debris. Getting trashed... Read more

Forum topic

The Water Sub-Group met today. This group is working on three items: 

1. Project Water Plan Template

2. Project Water Tracking Form Template

3. Research and Resources Document

The Meeting minutes are attached. The next meeting is 5/19/20 @ 2:30 PM CST, via webex and teleconference.  Please contact me if you would... Read more

Forum topic

Hello All,

ASHRAE and ICC released a draft standard for operational and embodied GHG evaluation.  It's on a fast track to be completed in time for the next code cycle.  This 30 day advisory draft includes dozens of questions looking for feedback from experts like all of you.  Please take a look and provide comments.  I've uploaded the... Read more

Forum topic

Hi friends,

We recently tracked our water consumption on site during the structural demolition of some existing reinforced concrete buildings.  The new OSHA silica regulations required us to keep dust to virtually zero, so we had a bunch of mist cannons and water hoses pumping water around the clock.  We consumed ~855,000 gallons in a... Read more

Forum topic

Not a green design question but a green firm design question... Finalizing the renewal of our Just certification, we're taking a fresh look at all our benefits & policies. We have already reviewed industry-wide survey data (AIA and PSMJ) but are interested in how the firms we admire (i.e., *you*) are approaching benefits in the transformed... Read more

Forum topic

Hello!

I'm curious what other firms like to use to run site-specific sun path and wind path analysises that is relatively intuitive to use and generates good graphics. We have used the climate consultant software for wind roses which is free and simple. We've also used sefaira but we're hoping to crowd source more resources. We purchased... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hello, 

Does anyone have experience with USGBC's Green Training Pilot Credit, and/or use of an innovation credit for subcontractor training? I was going to propose training to our subs on becoming an EnviroStars Businesses (WA Green Business Program) and also tie in the Sustainable Contractor's Commitment/project goals.

Since... Read more

Campus-wide Group

Forum topic

Hello everyone!

My role at Sundt Construction is both a Preconstruction Project Manager, and Chairman of the company's sustainability committee. I've been involved in green building since 2001 and have been in leadership roles in both the Arizona and Minnesota USGBC Chapters. I look forward to being an active member of this group.... Read more

Campus-wide Group

Forum topic

We have an increasing number of projects, where the client is coming to us with "net zero" aspirations and plans, some of which don't fit the typical all-electric, grid-tied building that produces 100%+ of its annual energy use on-site.  There include examples like:

1) A (targetd) living building that maximizes on-site production, with... Read more

Forum topic

Hello Green Gurus,

We’re always trying to improve this online space, from adding an events calendar and 5-minute presentation recordings, to creating a filterable member directory. We have several other ideas in the works, and we’re looking for a group of Peer Network members to help us test them before they go live.

Requirements... Read more