BuildingGreen Report

Forum topic

Have you been perusing the recently launched Contractor's Commitment and thought to yourself, 'Companies are going to need more guidance/templates/resources if they're actually going to implement this thing'? Good--now's your chance to help develop those resources.

The Contractor's Commitment Working Group is meeting December 1, 1pm ET.... Read more

Forum topic

Hello all,

We are having a mini office debate on fiberglass vs aluminum windows for use in schools (k-12) in Massachusetts. In the past we have always used aluminum windows on our schools, for durability. However, their performance is not as great as other products that are up and coming on the market. There is some hesitation to switch... Read more

Forum topic

Curious on stories when IAQ testing for LEED or WELL didn't come back with "all clear, everything's good" results we all hope for. 

I have a project right now where we are tracking down suspicious sources and look forward to telling the full story when it's done being written. 

Thought maybe this would be a good safe space to talk... Read more

Forum topic

As announced in last week's SDL/SCL Winter Summit, I have been working with a group of regional AEC professionals, industry stakeholders, and the New Buildings Institute on two code proposals to the 2021 Seattle Building Code that limit the Global Warming Potential (GWP) of concrete & steel in buildings over 50,000 sf (see attached).  We ... Read more

Product Guide

Many wood panels are unsustainably sourced, and some have high formaldehyde emissions.

BuildingGreen-Approved Panels

Laminate panels approved by BuildingGreen:

use substrates that meet CARB Phase 2 ultra-low-emitting (ULEF) or no-added-formaldehyde (NAF) emissions requirements and contain FSC-certified wood content or... Read more

Quiz

Welcome to the quiz portion of LEED v4 Tips from Early Adopters: Earn High Ratings Without Added Costs.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Explain how the Integrative Process credit rewards good design but is tricky for taxpayer-funded projects.
2. Describe how... Read more

Forum topic

I'm curious if anyone can share their strategy on indoor air quality for the return to office. Is this something that is prioritized at your firm from a wellbeing standpoint and with the current health crisis at hand? Lendlease is looking into options to safeguard our employees/occupants as we move back into the workplace and I'm researching... Read more

Forum topic

Hi,

We have a market-rate housing highrise project that is going through VE right now: we need cheaper/lighter rainscreen claddings than precast concrete or GFRC.

If you've gone through this similar exercise, I would greatly appreciate recommendations for cladding manufacturers/products with EPDs available. We are open to metal... Read more

Forum topic

Team,

After talking to UL today, I thought it will be good for them to do a presentation on what they see in embodied energy/carbon road map of MEP equipment can be like.

Should we schedule them for a 30 minutes presentation in the next call?

Best,

LL

Forum topic

Hello all,

My name is Stephen Messinger.  Thanks for including me in the group.  I am excited to get involved.  Glad to see some familiar and amazing names on this list.  

A little about me: I am born and raised in Massachusetts.  I live in Jamaica Plain (Boston) with my wife Lauren and two amazing daughters (Penelope, 4.... Read more

Forum topic

All--

A few months ago, I sent around a note about an article I was writing about the state of post-occupancy studies. It finally came out, in the latest issue of Metropolis. Great quotes and work from Payette, EDR, KieranTimberlake, HKS, and others. Thanks to all for helping with this.

I don't believe it's available online yet,... Read more

Forum topic

Our Green Team is holding a Biophilic Design workshop on Earth Day with our own staff for biophilic interventions within our office space. We are referencing the Biophilic Design Guidebook from LBC but it will be a shorter time frame, about 1.5 hours total. Last summer we introduced biophilia to the office through the exercise where each person... Read more

Forum topic

Anyone know what stages does CARE include? Does it include B1-5, C1-4 or D?

Thank you!

Forum topic

For those of you working in jurisdictions with both prescriptive and performance-based commercial energy code pathways, roughly what percentage of your projects are using the performance pathway? How do your project teams decide which pathway to follow?

In Minnesota we are seeing very few projects pursuing the performance pathway,... Read more