×

Error message

  • The specified file temporary://filecJsAVF could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filedr9eaL could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file9uJ0fH could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileD7sbD6 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileCZ9p5K could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Forum topic

Hold the date. February 6, 1:00 pm Eastern.

You won't want to miss this conversation with Tim Ryder, the staff person from Senator Schumer’s office who helped lead the development of the IRA. Tim will share about the sausage-making that led to the mess of incentives we’re coming to know and… love(?) And he's interested in our ideas on... Read more

Forum topic

Hi there SCLers,

Hope everyone is safe and healthy. I am posting on behalf of the Steeering Committee to let you know that the Committee has now adopted a Core Purpose Statement for the SCL Group. Please give it a quick read; we will likely sit with this and spend some time internalizing what it means at the upcoming Summit. 

The... Read more

Forum topic

Does anyone know where one can locate weather files (EPW) that has predicted future data for climate change?

Thanks in advance.

Basic page

Hurricane Tests Resilient Design—and Family Dynamics

A building project brings brothers back together, but a fast-moving storm challenges the project and the family.
Of storms & chins »

New Occupational Hazard Threatens Unshod Office Workers

Whistleblowers alert state health agencies to possible foot fungus scourge... Read more

Author

Forum topic

A colleague just pointed out an article about M-Fire. Its a factory applied fire inhibitor for wood construction. It's GreenGuard Gold but I can't find any real information. Have any of you heard of this or have any idea what it actually is? https://www.bisnow.com/national/news/construction-development/this-new-tech-will-stop-fires-before-they... Read more

Author

Hans “Grumpy” Grimm

Forum topic

Hello Everyone,

Here is the information and invitation to complete the SCL Demographics Survey! If you have multiple company colleagues on this forum (you can check in the group list here click "Group members" tab), please coordinate to have only one of you submit survey responses.

If you would you like to gather your answers... Read more

Quiz

Welcome to the quiz portion of Why Schools Are Embracing Net-Zero Energy!

Learning Objectives
Upon completing this course, participants will be able to:


Recount why schools are at the forefront of the net-zero energy building trend.

Describe the financial arguments that have led school boards to accept net-zero... Read more

Forum topic

Here is a fundamental question regarding measuring operational carbon emissions that I'm sure many of you can clarify for me:  Let's say you are considering design options and you want to know the relative contribution of GWP of adding an additional inch of continuous insulation to the building envelope.  The GWP from embodied carbon will... Read more

Forum topic

Hi all,

Thanks again to those who presented at the AIA Show & Tell! Here are the slides for some of the fascinating presentations we saw. Please do not share the slides outside of the networks unless they are marked “PUBLIC.”

There may be more to come; if you presented but did not yet provide permission for your slides to be... Read more

Forum topic

Hello all, 

Wondering if anyone has experience with lead limits in electrical cable and wiring? 

LEED for Healthcare allows a limit of 300 ppm of lead in electrical wire and cabling - my search for compliant products has been all dead ends. (MRc PBT Source Reduction - lead, cadmium, and copper)

Acceptable regulations for... Read more

Product Guide

Indoor pollutants can cause health problems and disrupt HVAC system functioning.

BuildingGreen-Approved Filtration

BuildingGreen approves a variety of equipment, filters, and pre-filters that remove particulates and contaminants, minimize pressure drop, or reduce pollution from operations. Products include:

MERV 13 or higher... Read more

Team Group

Forum topic

I'm looking to draft some one-page briefs for my consulting engineers to outline what we would like to see in their specs regarding certain materials and systems. For example, letting the plumbing and civil engineers know that we prefer to eliminate PVC pipe and want them to specify alternatives like Polypropylene, cast iron, ABS, etc. The idea... Read more

Forum topic

I'm hoping someone knows the anser to this question. For the LEED ND certification the minimum requirement is "The LEED project should contain at least two habitable buildings and be no larger than 1500 acres." Does habitable mean buildings with dwelling units?

Forum topic

Hi everyone,

Thanks so much again to everyone who attended the Spring 2024 SCL Summit. The report is now available and is a public document that can be shared.

Please feel free to email me with any questions. Enjoy!

Reports, Courses, Study Guides, Live Webinars

THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.

Forum topic

Columbia already offers access to free EV charging for our field employees. Of the few projects that have have opted in so far, we've had to custom design and intall EV charging setups. It's good that we're doing this, but it won't scale quickly enough and cost effectively.  I think a practical next step is working with trailer companies so... Read more