BuildingGreen Report

Team Group

Peer Network Event

Forum topic

Something we seem to be seeing a lot in our market recently are projects split into multiple packages - footing / foundation, C&S, and then later a TI package of CD's... mostly in an effort to speed up permitting and construction schedules. (Oftentimes with a contractor on board for a design / build approach). 

My question to the... Read more

Forum topic

Many on this list teach or have strong contacts with university programs, so I'm hoping to leverage our network in service of something that may be of general benefit.

EDR has a Research Fellowship program where we host young talent for 3 or 12 months addressing new theme each year. The Fellow(s) get "academic freedom" and have no... Read more

Forum topic

Hi Folks, anyone in Boston (or willing to move) this could be a super cool opportunity for you! 

https://careers-bpda.icims.com/jobs/1557/senior-resilience-design-reviewer/job?mobile=false&width=805&height=500&bga=true&needsRedirect=false&jan1offset=-300&jun1offset=-240

Forum topic

Is EV100 on your radars? We're reviewing our company leases and aleady have employee free access to EV charging at our office and jobsites by request (if technically feasible).

"With businesses owning over half of all new registered vehicles on the road, it is crucial that companies lead the shift to electric vehicles." Does your role in... Read more

Forum topic

Hi- Happy Monday!  

Does anyone know if there is an open-source list of manufacturers that have take-back programs? Looking for a summary/spreadsheet with details (costs, qty, etc). I have a small list but I'm guessing there is already one out there...

Also, Doesn't stage D in LCA account for take-back programs? Could this be... Read more

Forum topic

Well done and rivhly deserved, brother.  That makes you a Fellow Squared.

Forum topic

Hi all,

I wanted to reach out to fellow MEP energy modeling teams to assess everyone's experience with the new PCI calculation methodology in 2016. It was a substantial change in how we show savings on projects. Big changes can often come with un-intended consequences. I'm all for pushing to higher efficiency - just want to make sure we... Read more

Quiz

Welcome to the quiz portion of Rebuilding for Resilience in the Face of Natural Disasters!

IMPORTANT: This quiz covers three related articles within this topic. 

Learning Objectives
Upon completing this course, participants will be able to:


Explain the importance of resilient design at hospitals for ensuring life... Read more

Quiz

Welcome to the quiz portion of How to Succeed with the Living Building Challenge: 12 Teams Share Tips.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Prepare for LBC imperatives.
2. Structure an LBC process around absolute goals, with proactive leadership and follow-through... Read more

Forum topic

Has anyone submited this credit in lieu of demand response before?  I'm attempting on multiple projects but not sure what to expect review wise or how much confidence to have in the ability to get more than 1 point for trying.

https://www.usgbc.org/credits/gridoptimal-152-v4?return=/credits/New%20C...

Forum topic

We have a client thats going through a TI remodel in a building thats a LEED Core+Shell certified building. One of the questions we are trying to figure out is are there things we need to be doing to not imperil the building's certification. 

I think the answer is that the landlord had to write tenant guidelines at the time of... Read more

Forum topic

I see Kjell Anderson, Mary Ann Lazarus and Daniel Overbey as the Green Gurus on this list - if i missed anybody apologies.

Congrats all around folks!

https://www.usgbc.org/articles/gbci-announces-2018-leed-fellows 

Peer Network Event

Product Guide

Untreated rainwater leaving a developed site is effectively a chemical spill, laden with pollutants that include oil, sediment, heavy metals, nitrogen, and phosphorous. The heat carried by stormwater is also harmful to fish and other aquatic organisms.

BuildingGreen-Approved Systems

We approve systems that:

are designed to... Read more

Forum topic

Dear all,

On a major renovation where the wall R-value/U-value needs to be brought up to energy code, specifically a mass wall situation, does anyone have insights on how the situation is best dealt with? On the project in question for me, the continuous insulation might have to be added to the inside surface of the mass wall and there... Read more

Author

Forum topic

Hi folks,

Here's the next Peer Networks private webinar. As usual, it will be recorded and shared in the network if you can't make it in person:

Thursday, July 18, 2pm EDT (11am PDT)

The Center for Active Design (CfAD), operator of the Fitwel Certification System, recently launched Fitwel v2.1, which advances a vision where... Read more