BuildingGreen Report

Forum topic

Hi Everyone,

Who has worked on a SITES certification and can share the approximate hours involved for administering and completing documentation? A relative sense of the effort compared to LEED would also be helpful, similar to the thread about WELL on this same subject. 

Appreciate any insight. Thanks! -Hilary

Forum topic

Hi amazing people!

Most of our projects are now going with some form of gender neutral/all-gender/inclusive toilet rooms or those that can easily be converted to such. With no urinals, we lose 3 LEED points because urinals are very water-efficient. With urinals, it's not as pure a solution. Do you all just take a hit on the LEED points,... Read more

Product Guide

Untreated rainwater leaving a developed site is effectively a chemical spill, laden with pollutants that include oil, sediment, heavy metals, nitrogen, and phosphorous. The heat carried by stormwater is also harmful to fish and other aquatic organisms.

BuildingGreen-Approved Systems

We approve systems that:

are designed to... Read more

Forum topic

Hi everyone,

I'm interested in identifying any in-person opportunities (local to Greater Boston) to engage my office during Earth Week. We are all excited to be able to do things in person now, so if anyone has anything on their radar please let me know (a panel, educational activity, or volunteer opportunity!)
 

Thanks,... Read more

Forum topic

Hello SCL, 

For those who missed our last call, I am posting the results from the 2023 Contractor's Commitment reporting cycle. Reporting at some of the higher tiers requires sharing case studies or information with SCL or the public. All the information that can be shared publicly (or that I received express permission to share) is now... Read more

Quiz

Welcome to the quiz portion of Choosing Windows: Looking Through the Options.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Choose a frame material based on its structural characteristics, thermal insulation, durability, maintenance requirements, cost, and effects on the... Read more

Forum topic

Can you comment on successful ways you have used eQUEST and pitfalls you have seen? We are considering training our architects to use it for early building analysis on all projects. 

Forum topic

This may seem a bit in the weeds, but I have typically paid extra at Greenbuild for the access to the materials after the conference - we use that to develop presentations back to the teams who are not able to attend. For many years it was helpful - getting some materials to help folks see what they missed.  Last year they went to a new service... Read more

Forum topic

Embodied carbon in products and existing buildings. What does LCA tell us about renovation vs. new construction and material choices?

Guiding Questions: 

What easy ways are there to communicate about embodied carbon? Are there easy ways to calculate it?  What do I need to know about LCA? Are there any found patterns of when it... Read more

Forum topic

My name is Boyd and I’m the newest member of the BuildingGreen Peer Networks team. I’m joining BG after a long line of jobs in the service industry. I’ve worked everywhere from breweries to adventure sports companies and I’ve loved every job along the way. I was drawn to BG because of my history of meeting people and fostering connections and... Read more

Forum topic

Hi all - I can't remember this topic being posted recently so here goes. With fossil fuel free finally being something our clients are increasingly wanting to know about, we are stuck on diesel generators. They have several advantages including: cost, inherent refillability from a truck, reliability, and are the market standard. In initial... Read more

Forum topic

Green Gurus,

We'd love your feedback.

The MEP group is endeavoring to make progress on integrative design. It has been long accepted that integrative design is necessary to make real progress, but a lack of stellar results demonstrates that it is easier said than done.

What is your experience with successes and failures... Read more

Forum topic

My firm is mobilizing for a year of carbon awareness and reduction that goes beyond the energy consumption of our designs. We are looking to hire a full time person to take on LCA tracking for our current projects. Ideally it is a climate crisis super-hero of sorts who could also look at our design process and help develop multi-faceted... Read more

Forum topic

Hello friends in the construction group!

I am advising an owner on a huge redevelopment project and - we are of course looking at carbon/embodied carbon from a design perspective - but I remember hearing some of you talking about how you are addressing emissions during construction (including both recommendations related to specific... Read more

Forum topic

Hi SDL!

Our CM recently offered up the possibility of substituting Pozzotive into our structural and paving concrete mix (www.pozzotive.com) on a large public building. Apparently it is on a level with the cost of standard cement.
We are eager to reduce the project's embodied carbon, and this seems almost too good to be true.

... Read more

Product Guide

Interior doors may be a source of indoor emissions, and wood can be unsustainably sourced.

BuildingGreen-Approved Doors

BuildingGreen approves interior doors made from FSC-certified wood or reclaimed wood as well as composite doors with environmental features like:

rapidly renewable materials... Read more