BuildingGreen Report

Author

Forum topic

Congrats Nadav!!!! https://www.aia.org/showcases/181011-nadav-malin-hon-aia?utm_source=Buil...

Forum topic

Anyone know of tools/methodologies for estimating embodied carbon and carbon sequestration potential of individual green infrastructure projects (e.g. bioswale along bikeway)? I've seen tools for the larger scale (e.g. land use change) as well as specific to trees (e.g. i-Tree), but these don't fully meet my needs.

Thanks!

Firm-wide Group

Forum topic

Hi all, 

Following the SCL Summit back in November, the Waste Subgroup agreed to complete a Model Waste Management Plan to serve as a contractor commitment to reduce construction waste. I distributed the attached (very rough) draft back in Jan., and received some good feedback via forum comments. 

We would like to set up a call to... Read more

Forum topic

I've been seeing Armstrong's DC flexzone ceiling system at Greenbuild for many years. I'm working on a net zero project with LED lights and solar panels. In theory, the transmission losses in going from DC power from panels to AC for the building to DC for the lights would be eliminated. But does anyone actually have experience using this... Read more

Forum topic

Hi folks,

We had a rich conversation in our monthly meeting last week. I've summarized the highlights below. Next call is July 11 at 2pm eastern. If it isn't already in your calendar, here's the Zoom link.

What’s on people’s minds?

Looking into high-temp water-source heat pumps for industrial applications. Transom and... Read more

Quiz

Welcome to the quiz portion of LEED vs. Green Globes: A Definitive Analysis

Note: If you are taking this quiz as a member of LEEDuser, please take the quiz here.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Highlight the most significant differences between LEED and Green... Read more

Spotlight Report

Biophilic design features are not just aesthetically pleasing; researchers have found that patients heal faster, workers are more productive, and children learn better when more elements of nature are present.

And yet there are still very few projects developed today that inspire a connection to life and the natural world. Some people... Read more

Basic page

Meet the winners:

2024
2023
2022
2021

Forum topic

I’m a volunteer member of the ASHRAE 209 ("Energy Simulation Aided Design for Buildings Except Low-Rise Residential Buildings”) Committee.  Are you familiar with ASHRAE 209? It was first published in 2018, and it outlines a process for incorporating energy modeling into the design process. 

From the forward: 

 ASHRAE Standard 209... Read more

Forum topic

Hi all, are there requirements to include/submit backup documentation to the CC excel template? Or is it just the template itself that gets submitted? The question is coming up from our leadership over what documents are public vs internal.

Forum topic

For those folks who are on our retrofit electrfication roadmap post-palooza-sub-sub-working group ;-) , I thought you might be interested in these three guides just released from BEI in collaboration with S. Winter Associates.

Here are the three Playbooks:

Playbook 1 includes an overview of multifamily electrification and... Read more

Author

Andrea first became familiar with BuildingGreen in 2010 when she and her husband moved to Vermont and built their own passive house from the ground up. BuildingGreen’s president Nadav Malin heard about the project and asked if the staff could take a tour, and the rest is history. She joined the BuildingGreen team part-time in 2011 to work on... Read more

Forum topic

Hi,

Does anyone have experience or advice with installing temporary weather stations to gather data? We have a couple of projects coming up on existing occupied sites, and I would like to get what data I can from the sites to supplement the city weather file which is, as always, measured absolutely miles from site. There are thousands of... Read more

Forum topic

Our firm held off from signing the AIA Materials Pledge because it was perceived as a feel-good commitment to promise to have good intentions, with no tracking.  I was pleased to learn yesterday that reporting for signatories of the AIA Materials Pledge would "open" today (July 18) and close August 31, and would include mandatory reporting on... Read more

Forum topic

Show & Tell Breakout: share what’s working and what isn’t! Which tools are your favorites? Have you developed any innovative applications? Discovered new pitfalls?

Presentations:

Experiences with Sefaira Early Performance Modeling software. How I got the firm to subscribe, how it wasn't working, and how I have been working with... Read more

Forum topic

Has anyone had experience working with Hyper Metro (http://hypermetro.co/)? If so, did you find this company to provide value especially in dense urban environments where on-site segregation poses challenges to manage multiple C&D material streams on site? Hyper Metro claims to be able to provide rebates and to pay us for our trash.

Product Guide

Faucets with high flow rates waste water—not to mention the energy used to treat and deliver it to our buildings—and the additional water stresses our wastewater treatment systems.

Warnings Low-flow faucets may not be appropriate for every application. Where there are long pipe runs or large-diameter supply pipes, it can take longer for... Read more