BuildingGreen Report

Team Group

Forum topic

We should probably agree on the correct spelling for what we at BuildingGreen are calling "BITuser." I noticed that on the Salesforce portfolio screenshot provided by Dennis, it's spelled "BIT User."

BITuser has the advantage of more closely resembling LEEDuser, but it has the disadvantage of looking a little weird in all-caps, as in... Read more

Basic page

Hurricane Tests Resilient Design—and Family Dynamics

A building project brings brothers back together, but a fast-moving storm challenges the project and the family.
Of storms & chins »

New Occupational Hazard Threatens Unshod Office Workers

Whistleblowers alert state health agencies to possible foot fungus scourge... Read more

Forum topic

Here is a fundamental question regarding measuring operational carbon emissions that I'm sure many of you can clarify for me:  Let's say you are considering design options and you want to know the relative contribution of GWP of adding an additional inch of continuous insulation to the building envelope.  The GWP from embodied carbon will... Read more

Quiz

Welcome to the quiz portion of Why Schools Are Embracing Net-Zero Energy!

Learning Objectives
Upon completing this course, participants will be able to:


Recount why schools are at the forefront of the net-zero energy building trend.

Describe the financial arguments that have led school boards to accept net-zero... Read more

Forum topic

The results from the "CogFx" study are compelling, showing that people in environments with low VOCs and low ambient CO2 levels score higher on tests of cognitive function.  Specifically, they show that providing 40cfm of outdoor air per (actual live) occupant results in significantly higher scores than even the "Enhanced Ventilation" scheme... Read more

Forum topic

Has anyone documented the Food Alternatives credit as part of WELL or as an innovation credit in LEED?

Forum topic

Hello! 

We have several projects that are either pending ILFI Zero Carbon certification or the owner is planning to purchase offsets to cover construction emissions. Thus far, I have not considered this in our corporate footprint reporting. However, we are including A5 emissions whenever feasible and multiplying that performance over the... Read more

Forum topic

I'm looking to compile an outdoor weather station for a local project, and we'd like to add local outdoor CO2 information to our data. I usually work with Onset HOBO products, but they don't offer an outdoor CO2 sensor. Their weather stations can take data from any CO2 sensor with an analog output - does anyone have any suggestions?

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Portal

The current Stantec/BuildingGreen featured topic is Resilient Design. Read on to learn the essentials, and then dive deep to earn CEUS.

Also see the Material Health featured topic, and also a survey of topics trending in Stantec’s regions.... Read more

Forum topic

Hi All,

Has anyone successfully adopted a Revit to ClimateStudio workflow with their new export tool? Right now we are using cove.tool because it works reasonably well with iterative Revit modeling, but are itching to try a more accurate and nuanced alternative.

Thanks for any and all experiences!
Misha

Campus-wide Group

Quiz

Sustainability leadership has requested that you take this quiz to help assess sustainability literacy across the firm. Your own results will be presented to you at the end of the quiz but will not be shared with anyone else. Only aggregated, anonymized results will be available to others.

Please don’t do research to inform your answers... Read more

Campus-wide Group

Forum topic

We have a client who is asking us to design a roughly 10 ksf Wellness Center for PHIUS 2021 certification.  The program includes several high density assembly type spaces - roughly 300 person peak occupant load for the building.  The Criteria Calculator that the architect showed us puts the building peak cooling load at 4 BTUH/sf (3000 sf/ton... Read more

Forum topic

Hello fellow sustainable design leaders! I am about to kick off an intensive effort here at EHDD to refine our internal standards for materials. We will be considering both GWP as well as the health of materials (avoiding harmful chemicals). In addition to setting the standards, I will be working to develop a process to vet materials before... Read more

Product Guide

Using energy for cooling during peak hours places a large demand on utilities, is expensive, and can be less efficient than off-peak energy production.

BuildingGreen-Approved Thermal Energy Storage

BuildingGreen lists a variety of  thermal energy storage systems.

About

Off-peak cooling, or thermal energy storage (TES... Read more

Forum topic

Hi all,

We have a project in New Orleans that needs to meet the GSA Inflation Reduction Act (IRA) requirements and submit EPDs. For our concrete, there is only one manufacturer that meets the requirements and is more than 50 miles away (according to EC3). Does anyone have tips on attempting to talk to local concrete manufacturers about... Read more

Forum topic

Hi All,

My team member is leaving Webcor, and unfortunately that means we have to fill her big shoes with someone new! I thought I'd reachout here and see if you know anyone of high caliber looking for a Sustainability Manager position? Someone with LEED PM experience preferred, and a bit more technical background with MEP/ZNE ideally... Read more