BuildingGreen Report

Basic page

Peer Networks Application for Peer Network Membership Sustainable Design Leaders

The Sustainable Design Leaders peer group brings together the most committed sustainable design directors from leading architecture firms throughout the U.S. and Canada. We invite you to apply for membership.
We look for the... Read more

Product Guide

Office furniture’s materials and components can come from unsustainable sources, and use adhesives that emit formaldehyde or other volatile compounds.

BuildingGreen-Approved Furniture

BuildingGreen approves tables, desks, and other office furnishings certified to BIFMA’s multi-attribute level 3 standard, which requires low... Read more

Forum topic

Does anyone have a "healthy material" exterior bleacher benchtop (beyond natural wood or metal) recommendation for a public high school track and field? 

How do we discern between fiberglass, recycled plastic or HPDE?  Is there a rule of thumb on how to advocate for specifying a "not as bad" material? 

The project is in a coastal... Read more

Forum topic

Has anyone used a commercial heat pump water heater for a large protect?  I have found a few manufacturers for this technology, but want to make sure this is a viable and cost approach to electrical eliminate gas on a path to all electric.

Campus-wide Group

Forum topic

A colleague just pointed out an article about M-Fire. Its a factory applied fire inhibitor for wood construction. It's GreenGuard Gold but I can't find any real information. Have any of you heard of this or have any idea what it actually is? https://www.bisnow.com/national/news/construction-development/this-new-tech-will-stop-fires-before-they... Read more

Forum topic

Hello Everyone,

Here is the information and invitation to complete the SCL Demographics Survey! If you have multiple company colleagues on this forum (you can check in the group list here click "Group members" tab), please coordinate to have only one of you submit survey responses.

If you would you like to gather your answers... Read more

Forum topic

Here is a fundamental question regarding measuring operational carbon emissions that I'm sure many of you can clarify for me:  Let's say you are considering design options and you want to know the relative contribution of GWP of adding an additional inch of continuous insulation to the building envelope.  The GWP from embodied carbon will... Read more

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hello! 

We have several projects that are either pending ILFI Zero Carbon certification or the owner is planning to purchase offsets to cover construction emissions. Thus far, I have not considered this in our corporate footprint reporting. However, we are including A5 emissions whenever feasible and multiplying that performance over the... Read more

Forum topic

I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade.  They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design.  The products they're looking at claim... Read more

Forum topic

Hello all,

I need future weather files for a project. We are looking at three years, 2050, 2075, and 2095 using two climate change scenarios, low emissions, and high emissions. I have seen ARUP's Weathershift site that uses RCP 8.5 and RCP 4.5. Are we assuming that 2.6 is not achievable? I would have used this as a low emissions scenario... Read more

Forum topic

How interested are you in a Sustainable MEP Leaders Summit this summer? 

Please respond to this poll ASAP, as we need to gauge interest before we finalize any details.

When: Wed. July 26 at noon to Thurs. July 27 at 1:30. 
Where: At a conference facility near Boston
Cost: $1200, which includes lodging, meals, and... Read more

Forum topic

Hi All,

My team member is leaving Webcor, and unfortunately that means we have to fill her big shoes with someone new! I thought I'd reachout here and see if you know anyone of high caliber looking for a Sustainability Manager position? Someone with LEED PM experience preferred, and a bit more technical background with MEP/ZNE ideally... Read more

Quiz

Welcome to the quiz portion of Waste Water, Want Water.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Help clients make sound, holistic decisions about wastewater that take into account site, municipal infrastructure, energy goals, occupant needs, and maintenance considerations.... Read more

Forum topic

We have a client who is asking us to design a roughly 10 ksf Wellness Center for PHIUS 2021 certification.  The program includes several high density assembly type spaces - roughly 300 person peak occupant load for the building.  The Criteria Calculator that the architect showed us puts the building peak cooling load at 4 BTUH/sf (3000 sf/ton... Read more

Reports, Courses, Study Guides, Live Webinars

THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.

Hot spots: they might sound like fun places to hang out and have a drink—but in green building, they’re actually a bad thing. Something you track down so you can get rid of it. Kind of like being an environmentalist bounty hunter.

Life-cycle assessment (LCA) is... Read more