Forum topic
Hi Everyone - I'm posting this on behalf of Jeff Frost whom many of you know from his days as an SD Leader with SmithGroup and SERA and in his new role as head of Brightworks Sustainability's materials group. I am excited to be working with Jeff on this concept of multi-attribute product scoring. Cheers, Lona
Dear SDL’ers,
We’ve... Read more
Forum topic
Hello Everyone,
On September 9th a regional cross-network group gathered for the first in-person Peer Networks event since the beginning of the pandemic. All Peer Networks were represented at this Boston Region Mini-Summit! With this first one in the books, BuildingGreen is hopeful for paving the way to future regional events across the... Read more
Forum topic
Hi Carbon Working Group,
It’s been a while since our last online meeting on 3/31 –- admittedly, a bit too long -- so I wanted to share some updates. You might have seen Candice Pearson’s 5/13 post about the structure of the Contractor’s Commitment and how it’s evolving into a set of guidelines available not only to our SCL Group but to... Read more
Forum topic
Greetings Gurus!! I'm super excited to invite you all to help each other :)
As many of you know, BuildingEase (a completely free tool!) has been born this year, the newest function we just launched is the Crowdsourcing function.
Crowdsourcing lets anyone contribute products to a public Material List (similar to an Outline Spec)... Read more
Forum topic
If you’ll be attending AIA24 (or if you live in the D.C. area), join us for the BuildingGreen Show & Tell on June 5th from 6:00-8:30pm at ZGF! This will be a free joint reception with members of US Architects Declare, and it’s open to all Peer Network members. Light refreshments and beverages will be served.
Here is the link to... Read more
Quiz
Welcome to the quiz portion of The Product Transparency Movement: Peeking Behind the Corporate Veil.
Learning Objectives
Upon completing this course, participants will be able to:
1. Describe an EPD, naming at least six characteristics that it attempts to quantify.
2. Explain what the HPD Open Standard... Read more
Forum topic
This came up a number of times at the SDL Tempe Summit so I thought I would share. If you have not already I highly recommend this recent research paper from the UW-IDL on the tradeoffs of operational and embodied carbon in envelope design in different climates. As a Passive House nerd it made me question the super-insulated envelope at least... Read more
Basic page
Is your team ready to increase its sustainability knowledge? A team membership allows colleagues to work and learn collaboratively. We offer 10-person, 20-person, and 30-person team memberships. Make BuildingGreen your team's all-in-one... Read more
Forum topic
Hello Green Gurus,
Now is a pivotal moment. Net Zero Stretch Code legislation has been proposed in the Massachusetts House and Senate, and draft code language is currently being developed by the Board of Building Regulations and Standards (BBRS). The Net Zero Stretch Code is currently the greatest single opportunity to support reduced... Read more
Forum topic
The position for my replacement has been posted. Please share within your networks. Thanks!
http://www.fxcollaborative.com/profile/9/careers/
Forum topic
I've been asked to author an article on urban heat mitigation, and I wanted to include a plug for the above pilot credit, which I think is a really powerful new addition to LEED. Beyond introducing the "intent" and "credit requirements", I was also hoping to do (2) things within the article:
1) provide some feedback from those who have... Read more
Forum topic
Here are the links I mentioned at today's meeting:
Timeline:
https://docs.google.com/presentation/d/1RlN4t23uvBtxEzp4QuyqL-w5bqmE4P90...
BG Contacts and Responsibilities:
https://docs.google.com/document/d/1MWYuAEitjk7Zpc8KUNf1LwG3-5wK6sIlgwro...
BITuser Contacts and Responsibilities:
https://docs.google.... Read more
Product Guide
Rotary Uninterruptible Power Units
Power interruptions and brief changes in voltage can damage electrical equipment, compromise computer data, shut down manufacturing, and endanger hospital patients. In the case of power outages, generators usually take over, but about 98% of all interruptions last less than ten seconds, and there is a... Read more
Forum topic
Asking for a colleague:
"Have you ever had a large number of fire retardant tarps used to temporarily enclose a building during construction? Do you know of any solutions for recycling/reusing them or another product that doesn't use toxic fire-retardants that meets the performance criteria?"
I think we've all seen poly or fabric... Read more
Reports, Courses, Study Guides, Live Webinars
Returning to work: for many, it’s unthinkable without some kind of reassurance that leadership and the facilities team have taken all possible precautions. Lots of organizations are weighing in on what we should pay attention to, but how do we know if it’s working?
The free Re-entry program from Arc is a tracking and measurement... Read more