BuildingGreen Report

Forum topic

A colleague just pointed out an article about M-Fire. Its a factory applied fire inhibitor for wood construction. It's GreenGuard Gold but I can't find any real information. Have any of you heard of this or have any idea what it actually is? https://www.bisnow.com/national/news/construction-development/this-new-tech-will-stop-fires-before-they... Read more

Product Guide

Typically made from petrochemicals, carpet and its adhesives can offgas. It is also a challenge to recycle them, increasing the chances that it will be incinerated or disposed of in a landfill. Because carpet has a limited lifespan, its life-cycle performance is key.

BuildingGreen recommends modular carpet that demonstrates lower life-... Read more

Forum topic

Hi all,

We’re thrilled to share that registration is now open for our All-Networks Workshop on Integrated Design + Delivery from the Inside Out! The workshop will be held on July 15th at Miller Hull’s Seattle office, right before the Summer 2024 SDL Summit. Register now before it fills up, and please feel free to email me with any... Read more

Forum topic

Hi GG: Just wanted to make sure you know about a free webinar that Buildings & Cities and Carbon Leadership Forum are putting on:

Zero Carbon: Can Built Environment Education Deliver?

Monday 8 February 2021, 9 – 10 am PST

Details and registration through this site:

https://carbonleadershipforum.org/zero-carbon-... Read more

Forum topic

Have any of you heard of anyone ever using phase change material (PCM) "movable partitions" as a resiliency strategy to mitigate indoor overheating during a heat wave in passive buildings? You'd keep them stored in a basement or cool room, and deploy them into habitable spaces during the heat wave to keep the space cooler than the exterior... Read more

Quiz

Welcome to the quiz portion of Resilient Design: 7 Lessons from Early Adopters

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Recount the ten resilient design principles.
2. Recount each of the seven fundamental messages embraced by the model practitioners.
3. Describe... Read more

Forum topic

Hey, everyone! Reaching out to share about the currently-under-development IEA Annex 89: Ways to Implement Net-zero Whole Life Carbon Buildings. The current committee is really the who's who of building LCA in Europe, but it does seem like it suffers from a lack of North American representation. The one North American on the committee, in fact... Read more

Forum topic

Hi everyone,

We're still working to find the optimal time for the SDLS monthly call. We're now looking at the 4th Tuesday of the month. Please fill out this doodle poll to let us know which of these times work for you.

Thank you!

Jen

Forum topic

Hi folks, I'm reading Zen and the Art of Saving the Planet (Xmas gift) and came across this quote over the weekend which resonated for me, and thought might for this group as well:

"We may feel immense pressure to save the planet in this lifetime, and we may be afraid that we can never do enough. The stark truth is that the planet doesn'... Read more

Forum topic

Hi folks,

Registration is now open for the SDL Summer Summit. We expect this one to fill up, so if you plan on coming don't wait too long to register.

As usual, those of you who are coming will help set the agenda. We reviewed some ideas yesterday with the Steering Committee and agreed that some topics from January's Winter Summit... Read more

Quiz

Welcome to the quiz portion of Saying Goodbye to the Office—and Hello to Housing!

Learning Objectives
Upon completing this course, participants will be able to:


Understand the environmental impacts of new construction compared with adaptive reuse. List six reasons to save obsolete urban office buildings and turn them into... Read more

Campus-wide Group

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Dear all,

For a specific existing building application, we are looking for a half inch insulating glazing unit, preferably with low-e coating. Based on my research, 5/8" seems to be doable (1/8" glass + 3/8" air gap + 1/8" glass) but I'm yet to find a viable 1/2" solution. Have you come across any on your projects? Thanks for your... Read more

Campus-wide Group

Peer Network Event

Forum topic

Friends, I reviewed the firm's 2019 AIA 2030 data with a Principal, having organized the data in such a way that we could manipulate it. I included the average EUI and weighted EUI, since the latter gives a truer picture of where we are as a studio. In the past, the assumption was we would raise all boats with efforts to improve our practice in... Read more

Forum topic

Greetings Green Gurus!

You've probably been hearing about the infrastructure package on the news... apparently things are heating up on this topic in Washington DC as they try to get the package sorted out before the August congressional recess. Because of this, both the USGBC and the AIA are mounting advocacy campaigns in this regard,... Read more