BuildingGreen Report

Forum topic

Hello Folks,
What is your experience with successes and failures in the design process? As a starting point I have listed my Top 5 for success, and my Top 5 for failure. We'd love to see your reactions and look forward to the discussion when we all meet next week at our monthly check-in.

Top 5 reasons for when integrative design... Read more

Product Guide

Hardware has to be durable and resist weathering to ensure that features such as doors function properly.

BuildingGreen-Approved Hardware

BuildingGreen approves hardware that uses post-consumer recycled metal content beyond what is standard in the industry. Products from manufacturers that have engaged in information transparency... Read more

Forum topic

It is with the greatest pleasure that I announce to this esteemed group the recognition of our very own and much-loved leader Nadav Malin as an Honorary AIA member. AIA COTE had the honor to serve as Nadav's sponsor and we are pleased and delighted with this outcome (but not surprised of course.) For the record, "The AIA recognizes the notable... Read more

Forum topic

Has anyone completed an LCA for an engineering structures lab, particularly one that has a strong wall and strong floor? 

Quiz

Welcome to the quiz portion of Improving Resilience!

IMPORTANT: This quiz covers five related articles within this topic. 

Learning Objectives
Upon completing this course, participants will be able to:


Discuss resilient design options that prioritize safety, health, and emergency preparedness in the wake of disasters... Read more

Quiz

Welcome to the quiz portion of Net-Zero Energy Isn’t the Real Goal: 8 Reasons Why!

Learning Objectives
Upon completing this course, participants will be able to:


Describe why focusing on carbon instead of on energy at the building scale is a better choice for the environment. Name eight reasons why net-zero-energy buildings... Read more

Forum topic

Hi all,

We have a newly constructed, core/shell project having some hot water issues in the core restrooms.

There is a 0.35 Toto lav installed throughout. The hot water heaters are adjacent on each floor, located in the janitor closets. We did the math, and there could be a gallon of water standing and cooling in the pipe between... Read more

Forum topic

Gather with the Changemakers in Sustainable Construction

You are invited to join BuildingGreen and your peers for the Summit that has always delivered on driving our movement forward. Over three days of collaboration, workshops, learning, sharing, networking, and socializing, we’ll set the agenda for changes to LEED v5, strategize on... Read more

Forum topic

Greetings to all of the AEC SD Leaders (a.k.a. the Green Gurus)!

Over the last two months, the 32-member Build-Back-Better (BBB) letter working group has developed a robust list of first 100-days, built-environment-focused executive actions for the Biden administration to consider. Kara Kempski, the AIA’s Director of Federal Relations,... Read more

Firm-wide Group

Forum topic

As promised at the SDL Summer Summet: Hennepin County Energy & Environment's new Project Manager’s Guide to Material Reuse in Commercial Buildings, with specification language, guidance for procurement, and case studies of successful reuse projects around the country. This resource is meant to help owners, architects, and contractors... Read more

Team Group

Forum topic

Dear Colleagues:

If you are short on time, here is the executive summary:

Time to make healthy trouble and sign a petition today to the WHO to urge them to recommend the implementation of best practice healthy air guidelines in light of the recent studies showing a direct link between the spread of COVID-19 through aerosol... Read more

Peer Network Event

Forum topic

Hello - 

I am looking for the recording and the PDF/ slides that were shared 3/6 for the project process share-out/ 5 min presentations. It was super inspiring and I would like to refresh my memory of some of what was shared. Thank you!


Alison Nash 
AIA, LEED AP ID+C, CPHC, WELL AP
Associate | Sustainability... Read more

Forum topic

I'm still basking in the glow of yet another great Summit. I hope others who were there are feeling the same.

Here are the flip-chart pages from the many round-table conversations. Five-minute presentations to come shortly, followed by the Summit Report.

Feel free to use this thread to share other resources and thoughts.

... Read more

Forum topic

We've updated the Salesforce BIT Community domain from "https://southfacecommunities.force.com/BITBuilding/s/" to "https://www.bitbuilding.org/s/" and there are a few links on BITuser that point back to the community that need updating.

BIT Building Community Dashboard - point to "https://www.bitbuilding.org/s/" Contact Us - point to "... Read more

Forum topic

Colleagues:

I "lurk" on the list serve of the American Physical Plant Administrators.  I wanted to share a posting from that forum:

Hi All,

Two questions here: wondering if any Universities in the Pacific Northwest have a thermal comfort standard they adhere to for new building design on campus? UBC is currently undertaking... Read more

Forum topic

Hi Everyone - I hope this isn't a repeat topic. We are starting to get familiar with TallyCAT at SAR+ and have a few people testing our projects in it. Is anyone willing to help us troubleshoot or share lessons learned? We're running into a few errors and wonder if our Revit models and workflow are the issue, or if we need to be doing something... Read more