BuildingGreen Report

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Forum topic

Hi all,

I'm trying to figure out how to use this CLF MEP calculator tool that is downloadable from the CLF website. Please see screenshot attached - does anybody know what they are asking for as an input?

"Custom quantities input: The user can enter custom quantities on this tab and produce numerical results. For data input fill '... Read more

Forum topic

I would like to invite you to come see the progress of the Oakland EcoBlock on 4/21! Page is co-presenting at the ULI event and we have been pulling together the latest material. It would be great if you can join!

Posted yesterday on the OEB web page https://ecoblock.berkeley.edu/news/ Sign up here: https://sf.uli.org/events/detail/... Read more

Forum topic

We should probably agree on the correct spelling for what we at BuildingGreen are calling "BITuser." I noticed that on the Salesforce portfolio screenshot provided by Dennis, it's spelled "BIT User."

BITuser has the advantage of more closely resembling LEEDuser, but it has the disadvantage of looking a little weird in all-caps, as in... Read more

Basic page

Peer networks that allow knowledge sharing and collaboration between sustainability professionals

The Sustainable Design Leaders network and Summit events started over 10 years ago, when a group of sustainable designers realized that the struggles they faced and the goals they strove toward were shared by many... Read more

Quiz

Welcome to the quiz portion of Verifying Performance with Building Enclosure Commissioning.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Reason why the enclosure is fundamental to a sustainable building.
2. Explain why energy goals are less likely to be achieved without... Read more

Forum topic

Dear Sustainability Leaders,

During this time of shifting our lives and work to online, BuildingGreen is working quickly to assess the challenges and opportunities regarding the remaining Peer Network Summits for 2020. As timelines continue to be extended for social distancing (and virtually connecting!), we are mapping out the... Read more

Forum topic

I'm looking to compile an outdoor weather station for a local project, and we'd like to add local outdoor CO2 information to our data. I usually work with Onset HOBO products, but they don't offer an outdoor CO2 sensor. Their weather stations can take data from any CO2 sensor with an analog output - does anyone have any suggestions?

Forum topic

Hello fellow SD leaders,

This is a quick note to re-introduce myself to this group. I am a lapsed member from the original tribe of 2008 who has found my way back on a trail of bread crumbs left by Nadav (thanks Nadav!). I'm just glad to be back amongst my people, sharing and learning from you all, as we help each other to get where we... Read more

Product Guide

The overwhelming majority of wallcoverings are flexible vinyl, laden with all the life-cycle concerns that come with PVC. Products used to contain orthophthalate plasticizers—which make up a large percentage of these products. Phthalates are not bound in the material and can slough off in dust, exposing occupants during everyday work or play.... Read more

Author

Cher Hiblthren

Author

Forum topic

Hello All,

ASHRAE and ICC released a draft standard for operational and embodied GHG evaluation.  It's on a fast track to be completed in time for the next code cycle.  This 30 day advisory draft includes dozens of questions looking for feedback from experts like all of you.  Please take a look and provide comments.  I've uploaded the... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hello all, I would like to share an upcoming Virtual and In-Person conference for NOMA (National Organziation of Minority Architects).  Non-members can register, but I encourage anyone to join the organization to support the organization's mission.

"NOMA’s mission, rooted in a rich legacy of activism, is to empower our local chapters and... Read more

Forum topic

Figured I'd throw out this topic to the hive mind!

We are working on a project in the Midwest that involves taking down and replacing an 100-ish-year-old brick building. We are hoping to find a way to salvage and reuse some of this brick in new construction. I'd love to do an LCA comparison showing the benefits of salvaging the brick vs... Read more

Forum topic

Hey group,

I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.

The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more

Campus-wide Group