×

Error message

  • The specified file temporary://fileGMPUgA could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filedHjusK could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filetF0NvQ could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filexsFRII could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileSAlgOK could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Forum topic

Hi everyone, it was so great to meet some of you at the winter summit and finally connect names with faces!

We have a project that is targeting CalGreen Tier 2 and LEEDv4 Platinum.  Thought I'd reach out to see if anyone on this forum has found comparison guides between the two?  Looking for something similar to this CalGreen 2013 tier... Read more

Forum topic

Hello All-

  We have a K-12 school project that is using a R-60 flat roof assembly as an energy & costing benchmark (along with other energy efficiency measures but this is the relevant detail to our question).  The project mechanical engineer is not onboard with a number of our energy conservation measures and has been sharing... Read more

Forum topic

Hey there hive mind,

We went looking through LEEDuser to try and find some direction and didn't find much so I thought I'd bring my team's question here to all of you smart people. We're working on a non-combustion central plant tied to a geothermal field and grid electricity. The project has cooling towers and their associated chemical... Read more

Forum topic

I have a client seeking grant funding & they're vetting current US technology around large-scale prefabricated mass timber. My question to this group is if this currently exists anywhere in the US.

Qualifications:

10+ years experience manufacturing and installing large-scale prefabricated mass timber elements into completed... Read more

Forum topic

I read a very misleading article on the AIA's website today regarding antimicrobials and the benefit of microbicidals in paint. It was written by a manufacturer, not a healthcare professional, and was not obviously labeled as sponsored content on the website. (I received the link in an email, which did label it as such).

https://www.aia.... Read more

Author

Hans “Grumpy” Grimm

Forum topic

Hello SDL friends,

It has been an amazing opportunity to collaborate with so many of you through this group or through my work with Tally, the USGBC, ILFI, and in my role as an environmental researcher at KieranTimberlake. This is not so much a goodbye as it is a "hope to see you soon." I am making a shift away from building design into... Read more

Forum topic

Hi everyone - I will be holding my breath and attending the AIA conference in person this June. Is anyone else going? I'd love to reconnect with each of you!

Apologies if I've missed it - with there be a BuildingGreen meetup?

Feel free to email me if you don't want to reply all - kanderson@lmnarchitects.com

-Kjell

Forum topic

Team,

You probably know on July 9th, WHO issued a document and agreed aerosol route of COVID-19 transmission is possible, but fell short of saying we need to make provisions in our buildings for it per the "Do no harm" principle.  Mary Ann Lazarus, Pauline Souza, Kay Sargent, Joyce Lee, and I (SDL members from architecture and... Read more

Forum topic

Hello Green Gurus!

Here are the details for the next Peer Networks Webinar (happening next week!): Don't forget to REGISTER HERE!

Define and Contract for Building Performance Simulation Services Using ASHRAE Standard 209
Thursday, February 13, 3pm EST (12pm PST)

ASHRAE Standard 209-2018 “Energy Simulation Aided Design... Read more

Peer Network Event

Forum topic

Hi Fellow SD Leaders: This webinar from the AIA and the Building Resilience Coalition looks highly relevant and with some great speakers. It's free and open to all (I think...not sure how AIAU works for non-members.)

Free climate change risk webinar 10/23

Join members of 52 organizations of the Resilience Building Coalition for... Read more

Quiz

Welcome to the quiz portion of How to Succeed with the Living Building Challenge: 12 Teams Share Tips.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Prepare for LBC imperatives.
2. Structure an LBC process around absolute goals, with proactive leadership and follow-through... Read more

Campus-wide Group

Forum topic

I have a request from an Architecture firm to do a Fitwel Core and Shell certification.  I don't do that type of thing - anybody out there interested in this type of work?

Respond here or just email at me annehicksharney@gmail.com.

Team Group

Campus-wide Group

Forum topic

Show & Tell Breakout. Presentations:

Lessons learned from our Hopeworks Affordable Housing Project seeking LBC Petal Certification Optimize Solar Plugload and Power over Ethernet.