BuildingGreen Report

Forum topic

Hello Everyone,

Here is the information and invitation to complete the SCL Demographics Survey! If you have multiple company colleagues on this forum (you can check in the group list here click "Group members" tab), please coordinate to have only one of you submit survey responses.

If you would you like to gather your answers... Read more

Product Guide

Wood decking requires potentially hazardous preservatives and stains, and plastic waste is a significant environmental problem.

BuildingGreen-Approved Decking

Composite decking approved by BuildingGreen has at least 50% total recycled content. For plastic decking, post-consumer content has to be greater than 50%.

Health and... Read more

Forum topic

Here is a fundamental question regarding measuring operational carbon emissions that I'm sure many of you can clarify for me:  Let's say you are considering design options and you want to know the relative contribution of GWP of adding an additional inch of continuous insulation to the building envelope.  The GWP from embodied carbon will... Read more

Forum topic

Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more

Forum topic

Hello all,

I need future weather files for a project. We are looking at three years, 2050, 2075, and 2095 using two climate change scenarios, low emissions, and high emissions. I have seen ARUP's Weathershift site that uses RCP 8.5 and RCP 4.5. Are we assuming that 2.6 is not achievable? I would have used this as a low emissions scenario... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hello all, 

Any Fitwel experts out there? I have a 30,000 sf boutique hotel + spa client who would like to certify under the Fitwel rating system but Fitwel folks are telling me that no scorecard is currently available to hotel clients (can't use mulit-tenant or resi, that a hotel scorecard is under development). Has anyone used Fitwel... Read more

Forum topic

We have a client who is asking us to design a roughly 10 ksf Wellness Center for PHIUS 2021 certification.  The program includes several high density assembly type spaces - roughly 300 person peak occupant load for the building.  The Criteria Calculator that the architect showed us puts the building peak cooling load at 4 BTUH/sf (3000 sf/ton... Read more

Forum topic

I'm looking to compile an outdoor weather station for a local project, and we'd like to add local outdoor CO2 information to our data. I usually work with Onset HOBO products, but they don't offer an outdoor CO2 sensor. Their weather stations can take data from any CO2 sensor with an analog output - does anyone have any suggestions?

Forum topic

Hi all,

Thanks again to those who presented at the AIA Show & Tell! Here are the slides for some of the fascinating presentations we saw. Please do not share the slides outside of the networks unless they are marked “PUBLIC.”

There may be more to come; if you presented but did not yet provide permission for your slides to be... Read more

Forum topic

Hello everyone - 

I'm writing today to let you all know that as of this month, I am retiring from SERA, and that I'm going to be beginning a new journey as a consultant/volunteer!

I'm going to continue dedicating my time to policy and advocacy work (focused on decarbonizing the built environment) but now I'll be doing it as a free... Read more

Forum topic

Hello all, 

Wondering if anyone has experience with lead limits in electrical cable and wiring? 

LEED for Healthcare allows a limit of 300 ppm of lead in electrical wire and cabling - my search for compliant products has been all dead ends. (MRc PBT Source Reduction - lead, cadmium, and copper)

Acceptable regulations for... Read more

Forum topic

Under a high carbon scenario, most of North America will be 2 degrees C hotter by 2050. Meantime, we're designing buildings that will still be around in 2050, to codes that don't yet factor in chronic risks associated with climate change. I want to explain these risks to my colleagues; I'm hoping some of our green gurus can help answer the... Read more

Quiz

Sustainability leadership has requested that you take this quiz to help assess sustainability literacy across the firm. Your own results will be presented to you at the end of the quiz but will not be shared with anyone else. Only aggregated, anonymized results will be available to others.

Please don’t do research to inform your... Read more

Quiz

Welcome to the quiz portion of Whole-Building Life-Cycle Assessment: Taking the Measure of a Green Building.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define key concepts of whole-building LCA.
2. Recognize the inherent flaws, and potential gains, of whole-building LCA... Read more