×

Error message

  • The specified file temporary://file2JjFTU could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileHg0cQS could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileFU4xEp could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filen5T4dC could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filekBfNmR could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Forum topic

Good morning, All,

Just a bit of news this morning.  My family and I are moving back out west!  I am continuing in my current role with EwingCole, but will be doing so from Portland, Oregon.  Although North Carolina has a been a wonderful place for us for the past 13 years, it is time to be close to family in the northwest and southwest... Read more

Author

RoseAnn Grimes

Product Guide

Pipe that delivers domestic water in North America is typically made from copper, chlorinated polyvinyl chloride (CPVC), cross-linked polyethylene (PEX), all of which present environmental challenges. Bimodal polyethylene  (PE-RT) and polypropylene (PP) are potential alternatives with lower climate and health impacts.
... Read more

Forum topic

Hi folks, 

AIA COTE National is looking for Techincal Reviewers for the 2025 awards. Interested, or know someone who might be?  Sign up here: https://form.jotform.com/231175886103153

Thanks!

Forum topic

Hi there SD Leaders,

We're running an LCA on one of our projects that's about to start construction that has had serious embodied carbon goals and I got a result that really surprised me. I haven't been able to find any obvious/glaring issues with the work, but these results are strange enough that I'm not feeling confident. I'm hoping... Read more

Forum topic

Hello Green Gurus,

Now is a pivotal moment. Net Zero Stretch Code legislation has been proposed in the Massachusetts House and Senate, and draft code language is currently being developed by the Board of Building Regulations and Standards (BBRS). The Net Zero Stretch Code is currently the greatest single opportunity to support reduced... Read more

Forum topic

hi all! I'm almost at the finish line with this year's 2030 reporting...whew. I'm running into an issue that I wanted to throw out to this group, regarding the zero tool and national average baselines. Hoping some of y'all who manage your firm's 2030 data, or are just more familiar with CBECS and related data, have some insight / experience to... Read more

Quiz

Welcome to the quiz portion of Are Cool Roofs Green? The Answer's Not Black and White

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Explain why roofing choices are complicated by heating tradeoffs, climate effects, and condensation and how cool roofs are intended to reduce... Read more

Sales page

 

 

Join Brent & Alex to learn what's new and what's been updated in our BuildingGreen Guide to Thermal Insulation, Fourth Edition, including what you should know about:

Performance Health Environmental considerations Building science

So much has changed so quickly!

Our 30-minute roundtable... Read more

Forum topic

Hi Everyone - I hope this isn't a repeat topic. We are starting to get familiar with TallyCAT at SAR+ and have a few people testing our projects in it. Is anyone willing to help us troubleshoot or share lessons learned? We're running into a few errors and wonder if our Revit models and workflow are the issue, or if we need to be doing something... Read more

Forum topic

Congrats Nadav!!!! https://www.aia.org/showcases/181011-nadav-malin-hon-aia?utm_source=Buil...

Forum topic

Hi Everyone - I'm posting this on behalf of Jeff Frost whom many of you know from his days as an SD Leader with SmithGroup and SERA and in his new role as head of Brightworks Sustainability's materials group.  I am excited to be working with Jeff on this concept of multi-attribute product scoring.  Cheers, Lona

Dear SDL’ers,

We’ve... Read more

Product Guide

Glazing connects occupants to the outdoors, but with so many opportunities for air leakage, poor insulation, and thermal bridging, glazing is the primary weak link in building energy performance.

BuildingGreen-Approved Glazing Systems

BuildingGreen approves glazing that offers strong energy performance properties for a variety of... Read more

Forum topic

What thoughts do you have? What have others said that you feel we want to capture?

The Vision Vacuum: What’s driving environmental and social progress in architecture today? What should be driving it, and where should we be going?

Author

For more than 30 years, Alex Wilson has been the most trusted voice on energy efficiency and environmentally responsible design and construction. Since launching Environmental Building News (EBN) in 1992, he’s built a reputation, resources, and staff to provide the foundation for BuildingGreen, a consulting and information company... Read more

Forum topic

Has anyone completed an LCA for an engineering structures lab, particularly one that has a strong wall and strong floor? 

Forum topic

I'm sure most (if not everyone) is aware that LEEDv5 is under public review until May 20, 2024. I know I need to make time to flip through it, review, and comment, but I'm having a heckuva time protecting the time in my calendar to do that. Anyone interested in joining me for a 60 - 90 minute meeting to do this together as an accountability... Read more

Campus-wide Group